Similar Projects
Willmar City Hall
New Construction
Conception
Willmar, MN

Sheriffs ESD Headquarters Relocation
New Construction - 94,000 SF
Conception
Plymouth, MN 55447

Public Works Facility
New Construction - 60,000 SF
Design
$12,000,000 est. value
Orono, MN 55356

Public Works Building Expansion
Renovation, Addition - 50,000 SF
Design
Otsego, MN 55330

Prior Lake Fire Station #1 Remodel
Renovation
Bidding
Prior Lake, MN 55372

Madison City Hall Tower Rehabilitation
Renovation
Bidding
Madison, MN 56256

New Police Facility
Addition
Post-Bid
Crystal, MN 55422

New Fire Station 3
New Construction - 17,500 SF
Post-Bid
$6,300,000 est. value
Elk River, MN 55330

Newport City Hall & Public Safety Building
New Construction - 26,500 SF
Results
Less than $7,600,000 est. value
Newport, MN 55055

Heavy Construction at Fire Stations 2 and 3
Renovation
Results
$20,000,000 est. value
Plymouth, MN 55441

Portland And Washington Mixed Use
New Construction - 15,000 SF
Construction
Minneapolis, MN 55415

Portland And Washington Mixed Use
New Construction - 15,000 SF
Construction
Minneapolis, MN 55415

Columbia Heights City Hall
Build-Out - 20,000 SF
Pending Verification
Columbia Heights, MN 55421

Lonsdale New Police Facility
New Construction
Post-Bid
Lonsdale, MN 55046

Construction Management at-Risk Services for Carlton County Jail
New Construction - 55,200 SF
Results
$34,000,000 est. value
Carlton, MN 55718

Reported 03/18/2022 12:00 AM
Project Title

City Hall, Fire, Police Building Improvements Phase 1

Physical Address View project details and contacts
City, State (County) Saint Paul, MN   (Dakota County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall, Fire/Police Station
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected April 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: Renovation of existing building, roof replacement, new stud and masonry walls, mechanical and electrical upgrades.

Details

Fire/Police Station, Renovation, Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Suppression Sprinkler Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents