Similar Projects
Sewer/Catch Basin Cleaning, Inspections and Maintenance Services
Infrastructure
Bidding
Detroit, MI

2022-2024 Taylor Sewer Lining and Repair Contract
Term Contract
Bidding
$1,000,000 est. value
Taylor, MI

Sewer System Rehabilitation Project
Post-Bid
River Rouge, MI

CDBG Sewer Cleaning
Post-Bid
Taylor, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

2019 Brownstown Water and Sewer Improvements
Results
Less than $2,000,000 est. value
Brownstown, MI

Annual "On Call" As Needed Lateral Sanitary Sewer Tap Repair
Term Contract
Post-Bid
Dearborn Heights, MI

Repair Sinkholes, Catch Basins, Roads
Results
Highland Park, MI

Hydraulic and Hydrological Evaluation of City Storm Sewers, Combined and Sanitary
Alteration
Post-Bid
Dearborn, MI

Rehabilitation of Woodward Sewer System
Term Contract
Results
Detroit, MI 48200

Bid Package No. 7 Miscellaneous Improvements at Various Schools
Infrastructure, Alteration
Post-Bid
Lincoln Park, MI 48146

CSO Sewer Separation
Results
Dearborn, MI

2022 Manhole Rehabilitation Program
Infrastructure
Post-Bid
$300,000 est. value
Belleville, MI

Annual CCTV Sanitary Sewer Inspection
Term Contract
Results
MI 48111

Sewer Relief Phase 1B (Phases 1 and 2)
Infrastructure
Post-Bid
$2,000,000 est. value
Hamtramck, MI

Reported 06/09/2022 12:00 AM
Project Title

2022 Sanitary Sewer Cured-In-Place Pipe Lining Program

Physical Address View project details and contacts
City, State (County) Lincoln Park, MI 48146   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of 28,438 lineal feet of full-length cured-in-place pipe lining ranging from 8 inches to 24 inches in diameter and 75 sectional length cured-in-place pipe liners ranging from 8 inches to 24 inches in diameter throughout the City of Lincoln Park. The anticipated start date, weather permitting, is August 15, 2022, and is substantially completed by August 15, 2024, with final completion by December 30, 2024.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents