Last Updated | 05/16/2023 11:18 AM |
Project Title | Toilet Shower Building and Vault Toilet Replacement Council Grounds State Park - GPC (General Prime Contractor) |
Physical Address | View project details and contacts |
City, State (County) | Merrill, WI 54452 (Lincoln County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Misc. Recreational, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,118,100 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | n general, the work consists of: The removal of a toilet/shower building, removal of a toilet building with miscellaneous accessory structures, and the construction of a new toilet/shower building and the installation of a prefrabricated pit toilet buildings at Council Grounds State Park near Merril Wisconsin. The toilet/shower building has 1,715 square feet of enclosed areas and 289 square feet of covered area. Building construction has a poured concrete foundation and floor slab, masonry walls, wood roof trusses with metal shingles. Interior finishes are painted CMU and porcelean tile floor finish with associated plumbing, Ventilation and Electrical. Site preparation with demolition and new utilities and site development is included Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time specified for the bid submission. Third party delivery is entirely at the bidder risk A/E Contact: MSA Professional Services, Carter Arndt AIA, carndt@msa-ps.com, 608.355.8884 The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 3, 2017. This change does not affect the Federal Davis Bacon Act requirements. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. |
||||||||||||||||||||||||||||||
Details | 1,175 SF.
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |