Similar Projects
Fire Station #4 Expansion - PBF182 - City of Longmont
Addition, Infrastructure
Conception
$2,436,000 CJ est. value
Longmont, CO 80501

Louisville Lateral Ditch Piping - City of Louisville
Infrastructure
Conception
$3,016,000 CJ est. value
Louisville, CO 80027

Redtail Ridge - Former Phillips 66 Mixed-Use Development
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Louisville, CO 80027

Modular Housing Factory
New Construction - 31,250 SF
Design
Boulder, CO

RFQ - Homes on Hover (Name TBD)
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Longmont, CO 80501

Boys and Girls Club of Metro Denver Gates Camp Lagoon Relining
Demolition, Infrastructure
Bidding
$1,000,000 CJ est. value
Ward, CO 80481

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Willoughby Corner - CB1 & Senior Building
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lafayette, CO 80026

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Monarch High School Emergency Egress
Infrastructure
Construction
$30,869 CJ est. value
Louisville, CO 80027

Grace Commons Church
Addition, Demolition, New Construction, Infrastructure - 104,873 SF
Pending Verification
$45,000,000 CJ est. value
Boulder, CO 80302

Moss Rock Hotel / Lyons
New Construction, Infrastructure - 50,000 SF
Pending Verification
$15,000,000 CJ est. value
Lyons, CO 80540

Environmental Compliance Consulting Services
Term Contract
Conception
Louisville, CO 80027

Last Updated 06/07/2023 04:11 PM
Project Title

Installation of 'Tier One' Median Landscape Renovations

Physical Address View project details and contacts
City, State (County) Louisville, CO 80027   (Boulder County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $804,790 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 7 the project was awarded to Green Landscape Solutions for $804,789.61 . Work will include landscape demolition, earthwork/grading and installation of irrigation systems, hardscape surfaces, landscape plantings and various surface materials. This project will renovate and enhance landscape infrastructure within multiple roadway medians throughout the City of Louisville. The first phase of a multi-year project, "Tier One" medians were identified as being directly impacted by the 2021 Marshall Fire and/or in close proximity to fire damaged areas. Tier One median locations are as follows: McCaslin Blvd from Via Appia north to W Alder Street, Via Appia from McCaslin Blvd east to Tyler Ave and 88 th Street from Dillon Road south to St. Andrews Lane. In addition to repairing fire damage infrastructure, this project aims to maximize the rebuilding opportunity by re-imagining the aesthetic and ecological character of the areas. The goal is to not only make the areas more visually pleasing, but to decrease water use by eliminating turf grass, replace disease prone ash trees and revegetate utilizing a primarily native plant palette. The Scope of Work shall include but is not limited to the following: o Provision of all labor, materials and equipment necessary to complete work in accordance with project plans, details, specifications. o Removal of designated trees, plant materials, turf grass and irrigation infrastructure o Installation of design features including: irrigation systems, earthen berms, stacked rock walls, decorative concrete, metal edging, various landscape surface materials and plantings to include trees, shrubs, perennials and seeded grasses. o Coordination of an equipment and materials staging plan to be approved prior to construction. Note: On-site staging will be limited, however the City and Contractor will collaborate to identify staging locations in proximity to site access and work areas. o Coordination of a public safety plan to include street/lane/sidewalk closures to be approved prior to beginning construction. The contractor will be responsible for posting and updating all closure/safety signage throughout the project and communicating updates with City Staff. o The contractor will be responsible for obtaining all relevant City construction approvals including: Right-of-Way Access, Hydrant Meter/Backflow (if needed). No permitting fees will apply as the work will be performed for the City, however approvals still need to be obtained. o To ensure uniform bidding, please use the enclosed bid form. Bid form will be provided with plans and specifications following the pre-bid conference.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents