Similar Projects
Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Fire Department Vehicle Exhaust Extraction System
Post-Bid
Fort Mitchell, KY 41017

Cline Elementary School Elevator
Results
Alexandria, Cold Spring, KY 41076

HVAC Preventative Maintenance, NWS Paducah, KY
Results
Paducah, KY

New 800-Student Elementary School
New Construction - 88,967 SF
Construction
Mount Washington, KY 40047

Hazelwood HVAC System Replacement
Post-Bid
Less than $48,000 est. value
Louisville, KY

Walton Verona High School Rooftop Equipment
Results
Walton, KY 41094

HVAC Yearly Maintenance
Term Contract
Post-Bid
Elizabethtown, KY 42701

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

Boiler Replacement at Wellington Elementary School
Post-Bid
Louisville, KY 40216

Replace the HVAC Rooftop Units at Station 1
Results
Hebron, KY 41048

Vehicle Exhaust Removal System
Post-Bid
Elsmere, KY 41018

Disaster Recovery Services
Results

Both Pre-Construction Phase Services and Construction Phase Services
Addition
Results
Fort Mitchell, KY 41017

Jack C. Fisher Park Concession Building HVAC Upgrade
Results
Owensboro, KY 42301

Reported 12/16/2021 12:00 AM
Project Title

West End Elementary School - Gymnasium HVAC Renovation

Physical Address View project details and contacts
City, State (County) Middlesboro, KY 40965   (Bell County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $310,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the replacement of the existing HVAC system at the existing Gymnasium.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Steel Framing, Metal Decking.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents