Similar Projects
USACE R1 Middle McLoud CC
Conception
$10,100,000 est. value
Cedar Rapids, IA

CyRide Building Water Main Replacement - City of Ames
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Ames, IA 50011

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Crescent Chase Pond / Drainageway - City of Johnston
Alteration
Design
$1,830,000 est. value
Johnston, IA

RFQ Construction Manager at Risk - UIHC - John Pappajohn Pavilion - L7-10 - Vertical Expansion of Inpatient Tower
Addition, Demolition, Renovation, Infrastructure - 90,000 SF
Bidding
$50,400,000 CJ est. value
Iowa City, IA 52242

Bridge Replacement - CCS
Demolition, New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Vinton, IA 52349

Wagaman Mill Retaining Wall Repairs
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Lynnville, IA 50153

RFP Engineering - 156th Street Traffic Signals
Infrastructure
Post-Bid
$200,000 CJ est. value
Urbandale, IA 50322

Purina Drive Flood Wall Replacement
Results
$120,300 est. value
Dubuque, IA

South 35th and Grand Valley Culverts
Infrastructure
Results
IA 50265

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

East 14th Street Warehouse Distribution Center
New Construction, Infrastructure - 1,050,260 SF
Pending Verification
$114,000,000 CJ est. value
Des Moines, IA 50309

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

PCC Curb and Gutter
Infrastructure
Design
$500,000 CJ est. value
Le Mars, IA 51031

Seal Coat
Infrastructure
Bidding
$1,000,000 CJ est. value
Fairfield, IA 52556

Last Updated 09/20/2022 05:35 AM
Project Title

Remove and Replace Two Culvert Pipes

Physical Address View project details and contacts
City, State (County) Mason City, IA 50401   (Cerro Gordo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Remove & replace two 48" culvert pipes under an access. All materials, equipment, traffic control, & labor to complete the project as outlined. Bid items will not be itemized and shall be included in the lump sum price for the project. It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Questions: Until the contract is awarded the sole point of contact for this project is Tiffany Stupp (see bid contract information) any and all questions related to this project included during a site visit are to be submitted to Tiffany Stupp in writing preferably through the ION wave Bid system. Question Cuttoff Date & Time 9/18/2022 11:00:00 PM (ET) IADOT - Remove and Replace Two Culvert Pipes

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents