Similar Projects
Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

West Main Street Watermain Replacement - Norwich Public Utilities
Infrastructure
Conception
$8,000,000 est. value
Norwich, CT 06360

Breeze Car Wash
Demolition, New Construction, Infrastructure - 3,050 SF
Design
$700,000 CJ est. value
Waterford, CT 06385

Reid and Hughes Building Renovation
Demolition, Infrastructure, Build-out, Renovation
Design
$7,100,000 CJ est. value
Norwich, CT 06360

Delamar Hotel / Mystic - Revised
New Construction, Infrastructure - 29,868 SF
Bidding
$15,000,000 CJ est. value
Mystic, CT 06355

I-95 Interchange Improvements at Route 161 and Replacement of Bridge No. 00250
Demolition, New Construction, Infrastructure
Bidding
$160,000,000 CJ est. value
East Lyme, CT 06333

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Oakdale Elementary School Site Improvement
Alteration
Post-Bid
Montville, CT 06370

4th District Voting Hall Drainage and Site Improvements
Results
Stonington, CT 06355

Countryside Drive Association Water System Consolidation
Results
Norwich, CT 06360

Oswegatchie Hills Affordable Housing
New Construction, Infrastructure
Pending Verification
$317,000,000 CJ est. value
East Lyme, CT 06333

Parking Lot - New London Board of Education
Infrastructure
Pending Verification
$500,000 CJ est. value
New London, CT 06320

Route 82 Safety Improvement Phase 1 - from Banas Court to Fairmont Street, City of Norwich - Connecticut Department of Transportation
Infrastructure
Conception
$20,000,000 CJ est. value
Norwich, CT 06360

Hart Perry Boathouse and Jim Dietz Rowing Center
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Mystic, CT 06355

New Fire Station - Lisbon Fire Headquarters
New Construction, Infrastructure
Bidding
$1,250,000 CJ est. value
Lisbon, CT 06351

Last Updated 10/07/2022 10:12 AM
Project Title

Sewer Line Extension Phase III - Town of Ledyard

Physical Address View project details and contacts
City, State (County) Ledyard, CT 06339   (New London County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase III of project to extend sewer lines in Ledyard Center. As of October 7, 2022, this project is included in the Town of Ledyard' s FY 2023 - FY 2028 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents