Similar Projects
Water Supply and Storage Facility Phase 1 to Serve Crosby Farms
Infrastructure
Bidding
$2,000,000 est. value
Houston, TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Construction of the Remote Well Collection Line to Serve Rosehill Reserve
Post-Bid
TX

Construction of Water Well No. 5
Results
$2,254,000 est. value
Bunker Hill Village, TX

Monument Levee Pump Repair
Results
La Porte, TX 77571

Water Plant No. 1 Well No. 2
Alteration
Post-Bid
TX

Jasper Well No. 1 Transfer Pump Upgrades
Results
Houston, TX

Water Plant No. 1 Water Well No. 3
Infrastructure
Post-Bid
Houston, TX

Seepex Progressive Pump
Results
$22,905 est. value
Houston, TX

Remote Well No. 2 Control Panel Replacement
Infrastructure
Post-Bid
TX

San Jacinto Battleground State Historic Site Pump Repair
Results
Less than $109,240 est. value
La Porte, TX 77571

Replacement Central Plant Chilled Water and Condenser Pumps - North Harris
Infrastructure
Post-Bid
TX

4`Portable Trash Pump and 4` Male Cam and Groove X4 Female NPT Adapter
Results
Houston, TX 77017

Plugging of Decommissioned Water Well - Belleau Woods 2A
Infrastructure
Post-Bid
Humble, TX 77338

Water Well Replacement at Miller Road Camp for Harris County Precinct 1
Results
Houston, TX

Reported 05/27/2022 12:00 AM
Project Title

Artesian Well Restoration Project

Physical Address View project details and contacts
City, State (County) Humble, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of the breakout and removal of existing concrete pool, coping, electric, plumbing, electric service; installation of two level pools as shown in drawing, including electrical service, meter can, breaker box, pool equipment on gunite pad, 6-foot wooden fence with gate around pool equipment, 4-flood lights, auto fill and overflow line, InteliFlo VSF waterfall pump on artesian well head, and secure all permits required by the City of Humble.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents