MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Bidding
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Lindon City Culinary Waterline Replacement Project - Geneva Road
Post-Bid
Lindon, UT

Atmospheric Monitoring Replacement Program
Post-Bid
Less than $225,000 est. value
Salt Lake City, UT

Mabey Pond Water Supply Improvement Project
Results
Less than $310,000 est. value
Clearfield, UT

Otts Canyon Livestock Pipeline
Results
Vernon, UT

Solicitation to Obtain Water Treatment Service at Salt Lake City Air Route Traffic Control Center
Post-Bid
Salt Lake City, UT 84116

Culinary Water System Improvements in 2019
Results
Less than $2,000,000 est. value
Garden City, UT

100 South Waterline Replacements
Post-Bid
Centerville, UT

2018 PRV Vaults
Results
UT

Construction of JVWCD Retail Area Takeover Design
Post-Bid
Midvale, UT

Construction of the 2018 Culinary Waterline Replacement Project Phase 7
Results
American Fork, UT

Water Meter Replacement Project
Post-Bid
Springdale, UT

Construction of the American Fork City - American Fork Canyon Water Line
Results
Less than $3,163,132 est. value
American Fork, UT

Underground Pressurized Irrigation
Post-Bid
Bountiful, UT

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Reported 04/04/2019 11:47 AM
Project Title

Sand Hollow Regional Pipeline Alignment Preparation Project

Physical Address View project details and contacts
City, State (County) Saint George, UT   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Construction Complete as of February 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project will consist of construction of approximately 3.9 miles of pipeline alignment preparation including earthwork consisting of approximately 176,000 cubic yards of excavation and 102,000 cubic yards of embankment, and drainage culverts consisting of approximately 2,563 lineal feet of 18", 24" and 36" concrete pipe.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents