Similar Projects
Force Main Replacement Project
Bidding
$4,500,000 est. value
Abington, MA

Purchase of Ductile, Cast Iron, and Steel Fittings
Term Contract
Post-Bid
Brockton, MA

Fire Hydrants
Term Contract
Post-Bid
Brockton, MA 02301

Construction of Nemasket River Water Main Crossing at Wareham Street
Results
Less than $300,000 est. value
Middleborough, MA

2019 PCE Water Main Replacement
Results
Less than $1,750,000 est. value
Duxbury, MA

Water Materials and Supplies
Term Contract
Post-Bid
Marshfield, MA

Raynor Avenue - Water Main Replacement
Results
Less than $190,000 est. value
Whitman, MA

Constructing a Water Line
Post-Bid
Carver, MA

Construction of the Mill Street (Route 6) Water Main
Results
Less than $2,200,000 est. value
Marion, MA

Furnishing and Installing 3 Replacement Hydrants
Post-Bid
$48,200 est. value
Marion, MA 02738

Low Flow Toilets
Results
Less than $48,000 est. value
Pembroke, MA

Water Main Replacement Phase 4B
Post-Bid
$1,850,000 est. value
Scituate, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Repair Work to the Twin 24-Inch Diameter Water Transmission Mains
Results
Less than $35,000 est. value
Brockton, MA 02301

Water Meters/Reading Equipment
Term Contract
Results
Hanover, MA

Last Updated 11/09/2020 09:57 AM
Project Title

Bulow Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Hingham, MA 02043   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $540,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this contract includes, but is not necessarily limited to, the installation of approximately 2,000 linear feet of new 8-inch ductile-iron water main on Bulow Road, the installation of approximately 650 linear feet of new 6-inch ductile-iron water main on Bulow Place, and the installation of approximately 200 linear feet of new 6-inch ductile iron water main on Forget Me Not Lane. The project includes new fire hydrants, valves, replacing service connections with new services from the new main to the curb stop, trench pavement, and pavement mill and overlay within the State Highway Layout.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents