Similar Projects
STEAM Academy - Chambers County Schools
Renovation
Conception
$5,000,000 est. value
Lafayette, AL 36862

Smith Intermediate School Addition & Renovation - 2021 Bond - Cleburne Independent School
Addition, Infrastructure, Renovation
Design
$5,871,648 CJ est. value
Eufaula, AL 36027

New High School - Gulf Shores City Schools
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Foley, AL 36535

Caldwell Elementary Classroom and Gym Additions
Addition, Demolition, Renovation, Infrastructure - 22,917 SF
Bidding
$1,360,000 CJ est. value
Scottsboro, AL 35768

RFQ Contractor - Mountain Brook Elementary Schools 2021 Renovations
Renovation
Post-Bid
$600,000 CJ est. value
Mountain Brook, AL 35223

Improvements to Various Facilities for Bullock County Schools
Renovation
Post-Bid
AL

Classroom Improvements at Daleville Middle School (Proposal C)
Renovation
Results
Daleville, AL

New Classroom Building at Chilton County High School
New Construction - 7,283 SF
Results
$3,378,000 est. value
Clanton, AL 35045

9th Grade Academy Addition to Daphne High School
Addition
Construction
Daphne, AL 36526

Addition to Southeastern School
Addition
Construction
Less than $5,500,000 est. value
Remlap, AL 35133

Family/Consumer Science & Ag Shop Remodel At Fairview High - Cullman County Board of Education
Build-out
Pending Verification
$2,000,000 CJ est. value
Cullman, AL 35058

New Family/Consumer Science & Ag Facility At Hanceville High - Cullman County Board of Education
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hanceville, AL 35077

Classroom Renovation and Upgrades for the Midfield City Schools - Midfield High Career Tech Building Barbering Classroom
Renovation
Post-Bid
$400,000 est. value
Midfield, AL

New Classroom Building at the Isabella High School
Addition - 10,060 SF
Results
$2,440,000 est. value
Clanton, AL

Additions and Renovations to Mountain Brook Junior High School
Renovation, Addition - 43,500 SF
Construction
$14,381,000 est. value
Birmingham, AL 35213

Last Updated 03/21/2023 04:22 PM
Project Title

Awnings/Canopies

Physical Address View project details and contacts
City, State (County) Lexington, AL 35648   (Lauderdale County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $122,630 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Awnings/Canopies at the following sites; 1.Lexington High School 2.Waterloo High School 3.Wilson Elementary School A Pre-Bid Conference will be not be held. Questions from contractors may be directed to Mr. Mark Waddell at 256- 760-1300. Bid packets may be emailed upon request by contacting the Lauderdale County Board of Education, 355 County Road 61 Florence, Alabama 35634, at 256-760-1300. Bids should be placed in a sealed envelope clearly marked on the outside of the envelope. Lauderdale County Board of Education reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. The Lauderdale County Board of Education is an EEO/AA employer and any successful bidder will be required to comply with applicable federal and state laws and executive orders. 1. Details for each site are listed below. 2. The three sites are; a. Lexington High School, b. Waterloo High School, c. Wilson Elementary School 3. Provide all labor, materials, equipment and services required to complete installation of walkway coverings as indicated. 4. Comply with manufacturer's instructions and recommendations for installation. 5. Set plumb, level, and true to line, without warp or rack of framing members or panels. Anchor securely in place. 6. Awning/Canopy shall consist of heavy duty aluminum flat panel roof covering of at least .032 mil, and minimum 3 inch extruded poles. 7. Poles must be used as concealed downspouts for drainage of water from facia/gutter. 8. Poles shall be anchored to the concrete sidewalk as much as possible, or concreted into the ground. Where canopy can be attached to the building, poles will not be required. But recommended if needed. 9. Poles and roof panels shall be white in color. 10. Fasteners shall be heavily galvanized or cadmium plated. 11. Brackets, accessories, trim shall be provided and match primary members, as required for a complete cover installation. 12. Clean completed system promptly after installation. Remove excess sealant compounds, dirt and other substances from aluminum surfaces. 13. Supply manufacturer's standard literature and specifications for canopies. 14. Owner will be responsible for demolition and removal of old awnings.

Details

4,135 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents