Similar Projects
Oasis Road Solar Garden
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Sunrise Township, MN 55056

Sunrise Fiberglass Cold Storage Building
New Construction, Infrastructure - 5,000 SF
Conception
$500,000 CJ est. value
Wyoming, MN 55092

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

2023 Local Street Overlay
Infrastructure
Bidding
$850,000 CJ est. value
North Branch, MN 55056

2023 Local Street Overlay
Infrastructure
Bidding
$850,000 CJ est. value
North Branch, MN 55056

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CSAH 26 Reconstruction
Infrastructure
Results
Center City, MN

CR 79 Paving Project
Infrastructure
Results
Shafer, MN 55074

Coral Bells Solar
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Branch, MN 55056

Teal Avenue Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Shafer, MN 55074

2023 Street Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Chisago City, MN 55013

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CR 55 Surfacing
Infrastructure
Results
Center City, MN

Last Updated 04/15/2023 11:38 AM
Project Title

2023 East Viking Boulevard Improvement Project

Physical Address View project details and contacts
City, State (County) Wyoming, MN 55092   (Chisago County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,846,621 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2023 East Viking Street Improvements 17,700 S Y Remove Bituminous Pavement 14,000 S F Remove Concrete Walk 9,419 C Y Excavation (All Types) 4,011 C Y Aggregate Base Class 5 3,900 TON Bituminous Pavement (All Types) 29,000 S F 6" Concrete Walk 7,700 L F Concrete Curb and Gutter (B618) 8,400 S Y Sodding (All Types) 10,000 L F Pavement Markings (Paint) 590 L F 4" - 12" PVC Sanitary Sewer 1,400 L F 12" - 30" RCP Storm Sewer 50 L F 22" - 51" RCPA Storm Sewer 10 EACH Hydrant Assembly Bridge 13J22 East Viking Boulevard Over South Branch Sunrise River 290 S Y Remove Bituminous Pavement 1,092 L F Remove Guard Rail 1 L S Temporary Stream Diversion 1,139 C Y Excavation (All Types) 590 TON Bituminous Pavement 48 L F 16X6 Precast Box Culvert 48 L F 6X6 Precast Box Culvert 48 L F 28" RCPA Storm Sewer 1,020 L F Guard Rail 500 L F Chain Link Fence 0.5 ACRE Turf Restoration (Seeding) 2023 East Viking Street Improvements 17,700 S Y Remove Bituminous Pavement 14,000 S F Remove Concrete Walk 9,419 C Y Excavation (All Types) 4,011 C Y Aggregate Base Class 5 3,900 TON Bituminous Pavement (All Types) 29,000 S F 6" Concrete Walk 7,700 L F Concrete Curb and Gutter (B618) 8,400 S Y Sodding (All Types) 10,000 L F Pavement Markings (Paint) 590 L F 4" - 12" PVC Sanitary Sewer 1,400 L F 12" - 30" RCP Storm Sewer 50 L F 22" - 51" RCPA Storm Sewer 10 EACH Hydrant Assembly Bridge 13J22 East Viking Boulevard Over South Branch Sunrise River 290 S Y Remove Bituminous Pavement 1,092 L F Remove Guard Rail 1 L S Temporary Stream Diversion 1,139 C Y Excavation (All Types) 590 TON Bituminous Pavement 48 L F 16X6 Precast Box Culvert 48 L F 6X6 Precast Box Culvert 48 L F 28" RCPA Storm Sewer 1,020 L F Guard Rail 500 L F Chain Link Fence 0.5 ACRE Turf Restoration (Seeding) The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Paul Hornby at 651.325.6849 or phornby@wsbeng.com

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents