Last Updated 05/07/2021 10:11 AM
Project Title

2019 Roadway Paving and Reconstruction Project Phase II Improvements to Ernston Road

Physical Address View project details and contacts
City, State (County) Sayreville, NJ   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $401,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of concrete, roadway paving / reconstruction and utility improvements to Ernston Road and Lorraine Avenue between Garden State Parkway to NJ State Highway Route No. 35 / Mason Avenue rights-of-way located within the Borough of Sayreville. The work involved with these improvements includes the maintenance and protection of traffic; installation of approximately 1,000 lineal feet +/- of 6" diameter PPT underdrain; installation of approximately 40 lineal feet +/- of 12" diameter RCP of Class V storm sewer pipe reaches; construction of Type "C" inlet structures; reconstruction of approximately 22 +/- of various types of existing storm sewer inlet / manhole structures; removal and replacement of approximately 11 +/- of existing water service curb boxes; removal and replacement of approximately 5 +/- of existing deteriorated sanitary sewer manhole frames and covers; resetting of existing utility manhole castings and water main / hydrant valve boxes; removal of approximately 1,500 lineal feet +/- of various types of existing concrete curbs; removal of approximately 6,000 square feet +/- of various types of concrete sidewalks, driveways and/or aprons; construction of approximately 1,500 lineal feet +/- of new standard Borough concrete curb, approximately 5,500 square feet +/- of new standard Borough concrete sidewalk and approximately 1,000 square feet +/- of new standard Borough reinforced concrete driveways and aprons; furnishing and installation of cast-in-place handicapped sidewalk ramp delineation; restoration of hot mix asphalt parking areas and driveways; roadway milling of approximately 13,000 square yards +/- of existing asphalt pavement; crack / joint preparation and furnish / installation of joint sealer, if and where ordered; cutting / removal of approximately 500 square yards +/- of existing roadway asphalt pavement; the installation of dense graded aggregate base course, if and where ordered; installation of approximately 500 tons +/- of hot mix asphalt base course material, resurfacing the entire roadways with approximately 1,850 tons +/- of hot mix asphalt surface course material; application of approximately 6,500 lineal feet +/- of traffic pavement stripes / markings (4" wide lines); application of approximately 110 square feet +/- of traffic pavement markings (symbols); furnishing and installation of topsoil, seed and topsoil stabilization matting; right-of-way restoration; and all other preparation, restoration and associated work in accordance with the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents