Similar Projects
LiDestri Conveyor Bridge System & Tank Farm Expansion
New Construction
Design
Rochester, NY 14606

Design Build Services for Lower Westchester Bridge Bundle
Post-Bid
$100,000,000 est. value
NY

County Route 66 Bridge over Canisteo River PIN 6754.97
Post-Bid
Arkport, NY 14807

Replacement of the Benson Road (CR 6) Bridge Over Hatch Brook
Term Contract
Results
Lake Pleasant, NY

2019 Columbia County Multi-Bridge Element-Specific Bridge Work
Results
Hudson, NY

Preventive Bridge Maintenance - Lakeside Road BIN 3318990
Post-Bid
Albion, NY 14411

Replacement of the 4th Murray Hollow Road Bridge Over Murray Hollow Brook
Term Contract
Results
Cambridge, NY

Rehabilitation of Conklin Avenue Bridge over Pierce Creek (BIN 2003610) and Belden Street Bridge over Pierce Creek (BIN 2226260) PIN 9754.02
Post-Bid
Binghamton, NY 13901

County Route 21 Bridge Replacement over Tributary to Agawamuck Creek
Term Contract
Results
Hudson, NY

Replacement of Tully Farms Road (CR 234) Bridge Over Blue Hole Creek County Bridge C-161 Bin 3312970
Post-Bid
Lafayette, NY

Titus Towers Bridge, Creek, and Sidewalk
Results
Less than $223,000 est. value
Ithaca, NY 14850

Replacement of Hinsdale Bridge 62, County Road 26 (Gile Hollow Road)over Olean Creek BIN 3321770
Post-Bid
Little Valley, NY 14755

Joint Replacement of Dr Johnson Road (CR 64) Bridge Over the Batten Kill and Cemetery Road Bridge Over Black Creek
Results
Less than $500,000 est. value
Cambridge, Salem, NY

CR 114 (Master Street) Over the Powamppokonk Creek Bridge Replacement (BIN 3304080)
Term Contract
Post-Bid
Schaghticoke, NY 12154

Cedar Street BR (261-01) Over Ledge Creek Replacement
Results
Buffalo, NY 14202

Last Updated 12/11/2020 03:38 PM
Project Title

Main Street Over Chemung River Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) Elmira, NY 14901   (Chemung County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes rehabilitating the existing bridge over the Chemung Creek to increase the service life of the bridge. This includes rehabilitating spalls and cracks in concrete substructures, retrofitting fatigueprone details on the bottom flanges of all girders in the positive-moment areas with high stress reversals, replacing deteriorated secondary steel members, and cleaning and painting girders and diaphragms in the vicinity of deck joints. It also includes the removal and replacement of concrete deck and approach slabs, and the removal and replacement of all high-steel rocker (expansion) bearings and mid-span bearings (expansion).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents