Similar Projects
River Road Rehabilitation
Infrastructure
Bidding
Cincinnati, OH 45245

Summit Park Access Drive and Parking Lot Expansion
Alteration
Bidding
Blue Ash, OH

Sidewalk - HAM Mt. Healthy SRTS 2017
Post-Bid
Mount Healthy, OH

New Parking Lot
Post-Bid
Cincinnati, OH 45238

HAM-US22-14.74 Montgomery Sidewalk Project
Results
Less than $261,250 est. value
Montgomery, OH 45242

Green Township Eagle Lake - Nathanael Green Trail
Results
Less than $436,500 est. value
Cincinnati, OH

Anderson HS Partial Roof Replacements Anderson HS Partial Parking Lot Resurfacing
Infrastructure, Alteration
Post-Bid
Cincinnati, OH 45255

Sidewalk - US 27-10.39
Results
OH

Streetscape at College Hill Station
New Construction, Demolition, Infrastructure
Post-Bid
Cincinnati, OH 45245

Green Township Linneman Road Sidewalks Improvements
Results
Less than $179,971 est. value
Cincinnati, OH 45247

Auburn Avenue Improvements
Infrastructure
Post-Bid
OH 45219

Kuliga Park Improvements
Results
Less than $208,180 est. value
Cincinnati, OH 45247

Green Township Public Services Parking Lot
Results
Less than $225,450 est. value
Cincinnati, OH 45247

2020 Blue Ash Downtown Gateway Project
Results
Blue Ash, OH

Small Infrastructure Project
Results
Blue Ash, OH

Last Updated 11/24/2021 09:52 AM
Project Title

Kemper Road Sidewalk Project

Physical Address View project details and contacts
City, State (County) Sharonville, OH   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $340,642
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project limits are from US 42 to Highbanks Drive, a distance of approximately 3,200 feet. In general, the project work will consist of the following: Construction of 5' wide concrete sidewalk on north side of roadway. Construction of a 10’ wide asphalt shared use path leading into Sharon Woods. Resurfacing of existing asphalt parking lot inside Sharon Woods. Replacement of existing driveway aprons. Utility adjustments as noted.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents