Similar Projects
9905-- Exterior Signage Installation
Design
Boston, West Roxbury, MA 02132

Mass DOT Steel Beam Guardrail
Infrastructure
Bidding
MA

Parking Meter Removal, Signs and Bollards
Infrastructure
Bidding
Newton, MA

Pavement Marking Removal Airfield Paint Marking Installation
Post-Bid
Bedford, Worcester, MA

Pavement Marking Removal Airfield Paint Marking Installation
Post-Bid
Bedford, Worcester, MA

Roadside and Median Barrier Repairs and Replacements at Various Locations
Results
Less than $1,466,047 est. value

Scheduled and Emergency Fence Repairs at Various Locations
Results
Less than $365,000 est. value

Pavement Markings
Infrastructure
Bidding
Framingham, MA

Painted Traffic Lines
Post-Bid
$40,000 est. value
Westford, MA

Scheduled and Emergency Guardrail and Fence Repairs and Improvements at Various Locations
Results
Less than $174,000 est. value

Line Painting
Infrastructure
Bidding
$55,000 est. value
Reading, MA

Traffic Marking Services.
Post-Bid
Stoneham, MA

Application of Reflectorized Pavement Markings and Related Work at Various Locations (Excluding Nantucket Island)
Results
Less than $1,856,000 est. value

Replacing and Installing Building Signs in Region One Elderly Developments
Infrastructure
Bidding
$24,000 est. value
Boston, MA 02126

Guardrail Removal and Reinstallation
Post-Bid
Charlton, MA 01507

Last Updated 08/04/2021 09:31 AM
Project Title

Scheduled and Emergency Guardrail and Cable Barrier Repairs at Various Locations

Physical Address View project details and contacts
City, State (County) (Middlesex, Suffolk, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $864,750
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"80.000","Hr","Laborer","100.002" "60.000","Hr","Equipment Operator","100.009" "5.000","Cy","Class b Rock Excavation","144." "1.000","Ton","Disposal Of Treated Wood Products","184.1" "20.000","Hr","End Treatment Repair","600.1" "150.000","Ea","Guardrail Post- Cable Line Post","605.1" "6.000","Ea","Guardrail Post- Cable Line Post Set In Concrete Foundation","605.11" "3.000","Ea","Guardrail Post - Cable Release Post","605.2" "3.000","Ea","Guardrail Post - Cable Release Post Set In Concrete Foundation","605.21" "200.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "100.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "100.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "100.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "2.000","Ea","Trailing Anchorage","627.1" "35.000","Ea","Steel w Beam Terminal Section(Single Faced)","627.11" "15.000","Ea","Steel Thrie Beam Terminal Section(Single Faced)","627.3" "10.000","Ea","Steel Thrie Beam Terminal Section(Double Faced)","627.4" "2.000","Ea","Steel Thrie Beam Terminal Connector","627.5" "16.000","Ea","Steel Highway Guard Transition Beam","627.6" "2.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "30.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "25.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "15.000","Ea","Guardrail Flared End Treatment, Tl-2","627.92" "15.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "2.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "1.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "1.000","Ea","Transition To Bridge Rail","628.24" "1.000","Ea","Transition To Thrie Beam","628.25" "200.000","Ft","Highway Guard Removed And Reset","630." "7000.000","Ft","Highway Guard Removed And Discarded","630.2" "250.000","Ea","Guardrail Post - Steel","632." "100.000","Ea","Guardrail Post - Wood","632.1" "50.000","Ea","Individual Post Removed And Reset","632.2" "250.000","Ea","Individual Post Removed And Discarded","632.4" "50.000","Ea","Guardrail Offset Block - w Beam","633." "50.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "700.000","Ea","w Beam Guard Panel","634." "5.000","Ea","w Beam Highway Guard Panel - Curved","634.01" "375.000","Ea","Thrie Beam Guard Panel","634.1" "1.000","Ls","Equipment For Engineers Field Office","747." "1.000","Ea","Martha's Vineyard Mobilization","748.01" "15.000","Ea","Emergency Response","748.1" "100.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "100.000","Ea","Delineation For Guard Rail Termini","833.7" "120.000","Day","Traffic Cones For Traffic Management","851.1" "240.000","Sf","Safety Signing For Traffic Management","852." "120.000","Day","Truck Mounted Attenuator","853.403" "4.000","Day","Temporary Illumination For Work Zone","853.8" "120.000","Day","Arrow Board","856."

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents