Similar Projects
O'Reilly Auto Parts (HRO) / Hernando
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Hernando, MS 38632

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Chester Willis Field Renovation
Infrastructure, Renovation
Design
$2,500,000 CJ est. value
Natchez, MS 39120

2023 BIL Clarke County Airport Fuel Farm Improvement
Infrastructure
Bidding
$200,000 CJ est. value
Quitman, MS 39355

Rehabilitation of Water Well #4
Infrastructure
Bidding
$1,500,000 CJ est. value
Kosciusko, MS 39090

Hermanville Multi-Use Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Port Gibson, MS 39150

Choctaw County Schools Football Stadium
New Construction, Infrastructure
Post-Bid
$70,000 CJ est. value
Ackerman, MS 39735

2021 Wastewater Treatment Plant Improvements, Phase 2
Renovation
Results
Cleveland, MS

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

Hernando High School
New Construction, Infrastructure
Construction
$85,211,000 CJ est. value
Hernando, MS 38632

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

38th Avenue Pathway
Infrastructure
Pending Verification
$350,000 CJ est. value
Hattiesburg, MS 39401

Y1PZ--CONS Natchez NC Expansion/Demo Mx Fac/Roads (866CN3029/866CM3030) (VA-23-00072411)
Addition, Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Natchez, MS 39120

Coahoma, Bolivar, Sunflower, & Sharkey Counties, Ms, Sediment Reduction Structures, Phase Xii, Fc/mr&t, Big Sunflower River Basin
Infrastructure
Bidding
$5,000,000 CJ est. value
Coahoma, MS 38617

Last Updated 06/23/2023 12:09 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Summit, MS 39666   (Pike County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $492,468 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved in the project includes the replacement of electrical/control equipment at the Peters Street Water Treatment Plant and rehabilitation of an existing 100,000 gallon concrete clear well and replacement of a 1,000 gallon aerator at the MLK Jr. Drive Water Treatment Plant The Town of Summit reserves the right to waive irregularities and to reject any and/or all bids Question Deadline 05/01/2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents