Similar Projects
CDBG 2nd Ward Park Improvements
Renovation
Bidding
$400,000 est. value
PA

Pickleball Courts Phase 2
New Construction
Post-Bid
Glen Mills, PA 19342

Upland Park Playground
New Construction
Post-Bid
Upland, PA 19015

2020 CDBG Playground Improvements at Garchinsky Park - Union and Edgmont Avenues
Results
Less than $160,000 est. value
Clifton Heights, PA 19018

Playground Projects at the Marple Campus
Results
Broomall, PA 19008

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

Lexington Avenue Playground Improvements
Results
$50,000 to $55,000 est. value
Eddystone, PA 19022

Playground Preperation Work, Demolition of Retaining Wall, Excavation of Elevated Play Area and New Retaining Wall
Infrastructure
Results
Morton, PA

FY 2020 CDBG – Collingdale Park Playground Improvements
Infrastructure
Results
Collingdale, PA 19023

Nall Field Development Project
Infrastructure
Results
$185,000 to $195,000 est. value
Folsom, Ridley Park, PA 19078

Park Improvements Bosacco Park Playground Improvements
Infrastructure
Results
Colwyn, Darby, PA 19023

Veterans Park Rehabilitation
Renovation
Results
Broomall, PA 19008

Playground Improvements - McClurg and Octagon Parks
Infrastructure
Results
Chester, PA

Barry Bridge Park Pavilion and Park Upgrades
Renovation
Results
Chester, PA

Rehabilitation of the Basketball Courts at Odorisio and Cowan Parks
Renovation
Results
Radnor, Wayne, PA 19087

Last Updated 04/21/2022 01:58 AM
Project Title

Samuel Womack Park Improvements

Physical Address View project details and contacts
City, State (County) Chester, PA 19013   (Delaware County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To remove existing dilapidated site amenities and install new playground equipment, resurface tennis court and convert into a basketball court, install an ADA Accessible walking path, and incidental site improvements. The project includes the installation of various site amenities, including a park shelter. Removal and reconstruction of the existing features will require soil erosion and sediment control measures that includes the installation of silt fence.The onsite improvements consist of the installation playground equipment, playground mulch, concrete sidewalk, concrete curb, park benches, trash receptacles, concrete walking paths, a playground sign, park grill, park shelter, park table and other incidental improvements. Stormwater management improvements include the construction of a rain garden with underground piping.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents