Similar Projects
Willows Addition Drainage Mitigation Project
Infrastructure
Bidding
Siloam Springs, AR

Construction of Weatherton Drainage Improvements
Infrastructure
Bidding
Lowell, AR

Corrugated Steel Pipe and Bands
Post-Bid
Hamburg, AR

Drainage Improvements
Infrastructure
Post-Bid
Ward, AR

Hwy. 154 Slide Repair (Conway CO)
Results
AR

Deans Trail Phase 2
Results
$2,300,000 to $2,400,000 est. value
Springdale, AR

Raintree Acres Drainage Project - 2A
Infrastructure
Bidding
Bryant, AR

Reclamation of Brotherton Highwall
Infrastructure
Post-Bid
Branch, AR

Zoo Drainage Improvements Project
Infrastructure
Results
Little Rock, AR 72205

Zion Street Drainage Improvements
Infrastructure
Bidding
Lowell, AR

Adams Field and Fourche Creek Remediation
Infrastructure
Post-Bid
Little Rock, AR

Benton Utilities - Chenault North Reservoir Levee Repair
Infrastructure
Results
Benton, AR

Channel Realignment
Infrastructure
Bidding
Lowell, AR

Purchase of Precast Reinforced Concrete Box Culverts
Infrastructure
Post-Bid
Rogers, AR

Reclamation of AML Montreal Gob Pile
Infrastructure
Results
Huntington, AR 72940

Reported 03/17/2022 12:00 AM
Project Title

Blueberry Lane and Mountain Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Garfield, AR   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of the Blueberry Lane & Mountain Drive Drainage Improvements. The project consists of removing approximately 900 LF of existing natural roadside ditch and storm pipe and replacement with grouted rip rap ditch and concrete storm pipe to improve drainage along Blueberry Lane and Mountain Drive in Garfield, Arkansas. Asphalt overlay approximately 2,100 SY of existing asphalt and gravel roadway. Erosion control measures and grading activities to be constructed as part of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents