Similar Projects
Gam/Washington Window Replacement - Ohio University
Renovation
Conception
$3,300,000 CJ est. value
Athens, OH 45701

RFQ Design - Bryan Hall HVAC and Life Safety Upgrades 2022
Renovation
Pending Verification
$8,400,000 CJ est. value
Athens, OH 45701

Attic Insulation Ignition Barrier
Renovation
Post-Bid
$630,000 CJ est. value
Oxford, OH 45056

Siddall Hall Renovation
LEED Certification, Renovation
Construction
$78,500,000 CJ est. value
Cincinnati, OH 45219

CWRU South Residential Campus
New Construction, Infrastructure - 195,900 SF
Construction
$54,000,000 CJ est. value
Cleveland Hts, OH 44106

John Carroll University South Gateway
Demolition, New Construction, Infrastructure - 346,837 SF
Pending Verification
$185,000,000 CJ est. value
University Heights, OH 44118

RFQ D/B - Baker Mezzanine Elevator
Renovation
Post-Bid
$827,612 CJ est. value
Columbus, OH 43210

Siddall Hall Renovation
LEED Certification, Renovation
Construction
$78,500,000 CJ est. value
Cincinnati, OH 45219

RFQ D/B - Bathroom Renovations in Wings 1C and 1D of the Main Building at the Dayton Job Corps Center
Term Contract, Demolition, New Construction, Renovation
Post-Bid
$5,000,000 CJ est. value
Dayton, OH 45417

Cedarville University Residence Hall
New Construction, Infrastructure
Pending Verification
$34,200,000 CJ est. value
Dayton, OH 45402

Last Updated 09/20/2023 01:35 PM
Project Title

Bryan 4 Pipe/MU Air/Fire Alarm/Lobby/Sanitary Repair/Roof/Windows - Ohio University

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $8,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is included in the Ohio's University FY 2023-2028 Capital Improvement Program. As of July 15, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents