Similar Projects
Reconstruction of sidewalks and curbs - 390258 - City of Kansas City
Infrastructure
Conception
$580,000 CJ est. value
Kansas City, MO 64113

New Life Villas - New Life Community Development Corporation
New Construction, Infrastructure
Conception
$5,700,000 CJ est. value
Grandview, MO 64030

Three Light
New Construction - 7,600 SF
Design
Kansas City, MO 64108

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Whittaker Facade Prospectus
Renovation
Post-Bid
$30,000,000 to $50,000,000 est. value
Kansas City, MO 64106

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

2021 Shalimar Park Field Grading
Infrastructure
Results
Grandview, MO 64030

Salisbury Road Water Main Replacement
Infrastructure
Results
Independence, MO

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Origin Kansas City Hotel
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Kansas City, MO 64120

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Pacific + Troost Residential
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Kansas City, MO 64106

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

Last Updated 03/14/2023 05:14 PM
Project Title

KCMO City Hall Parking Garage & South Plaza Restoration

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64106   (Jackson County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Capitol/Court House/City Hall, Misc. Buildings, Parking Garage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

McCownGordon Construction is requesting Subcontractor bid proposals for the KCMO City Hall Parking Garage & South Plaza Restoration. Work includes restoration and partial replacement of the existing underground parking garage at KCMO City Hall, replacement of the plaza on top of the garage, a new enclosed stair tower, and an alternate for an entry vestibule addition on the south side of the plaza. Scopes of work bidding with this package include: interior selective demolition, structural demolition, structural concrete, concrete restoration, structural CMU, stone masonry, stone cleaning, miscellaneous iron, roofing, waterproofing, sprayed fireproofing, hollow metal doors, glass and glazing, acoustical ceilings, drywall, stone and terrazzo flooring, paint, fire sprinklers, plumbing, HVAC, electrical, traffic control, utilities, landscaping & irrigation. All bids shall be held for a period of 30 days. Bid Bonds are not required. Prior to being awarded a contract, all bidders are required to qualify with McCownGordon. McCownGordon utilizes a secure online system to administer the qualification review process. Bidders who are not prequalified should go to electronically and click the Prequalify Now link to begin the process. Any questions regarding the prequalification process should be directed to Sam Dwyer All questions shall be submitted via e-mail to the contact noted above. Construction Start 7/13/2023 Construction Completion 12/6/2024 All questions shall be submitted no later than 5:00pm on Friday 3/3/2023 Project is NON-TAXABLE 1.11.1 Project is subject to prevailing wage requirements, Missouri Division of Labor Standards Annual Wage Order No. 28 for Jackson County. 1.11.2 Project requires union labor for the following trades: work performed by carpenters. 1.11.3 This project requires Certified Payroll 1.11.4 Work to occur during normal business hours. 1.11.5 This project does not require background screening of all employees working on site. 1.13.1 Project is subject to Liquidated Damages in accordance with the prime contract. 1.13.2 $1,500 per day until substantial completion. $500 per day until final completion. 1.14.1 Project is subject to any MBE or WBE participation goals (KCMO Certified MBE and WBE). Subcontractor shall comply with any minority/women's business development initiative or program. Further, Subcontractor acknowledges Contractor's mission to execute a standard of "best practices" in the construction industry by expanding access to contract and employment opportunities for minorities and women. Contractor seeks to maximize the participation of Minority Business Enterprises ("MBE") and Women's Business Enterprises ("WBE") and to increase the number of minorities and women working on projects. Subcontractor agrees to work with Contractor in good faith to provide reasonable assistance in achieving the diversity objectives, if any, identified in the Contract Documents. Subcontractors will be responsible for meeting and exceeding the stated MBE and WBE participation goals and objectives and for participating in this process throughout the duration of the Project. 1.14.2.1 MBE Participation Goal = 15% 1.14.2.2 WBE Participation Goal = 15%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents