Similar Projects
C2104 Dupont Feedwater Pump Replacement
Post-Bid
Less than $24,000 est. value
Fitchburg, MA 01420

Mckay Steam Valves Replacement
Post-Bid
$19,000 est. value
Fitchburg, MA 01420

Boiler Replacement Northbridge Middle School - General Bids
Results
Less than $2,395,065 est. value
Northbridge, Whitinsville, MA 01588

New Mechanical Installation for Building B Addition
Results
$200,000 est. value
Worcester, MA

Emergency and Non-Emergency Repair Service and On-Call Mechanical and Facilities Repair
Alteration
Post-Bid
$200,000 est. value
Milford, MA

Oil Burner Service and/or Boiler Cleaning Service
Results
$55,000 est. value
Jefferson, MA

Boiler Replacement, Nipmuc Regional High School - General Bids
Alteration
Post-Bid
$1,106,437 est. value
Upton, MA 01568

Electric Hot Water Heater Replacement
Results
$38,000 est. value
Athol, MA 01331

Chiller Replacement at Lunenburg Public Safety Building
Alteration
Post-Bid
$135,000 est. value
Lunenburg, MA 01462

Heating Boiler Replacement Ghosh Science and Technology Center
Results
$649,820 est. value
Worcester, MA 01602

Machine Shop At Conley Terminal
Alteration
Post-Bid
Boston, MA 02127

Delivery and Installation of Electrical, Mechanical
Alteration
Results
$40,000 to $60,000 est. value
Whitinsville, MA

Plumbing, Heating, and Mechanical Services
Term Contract, Alteration
Results
$130,000 est. value
Westborough, MA

Boiler Condensate System Repairs, Administration Building
Alteration
Results
$49,700 est. value
Worcester, MA 01606

Temporary Boiler at Crocker Elementary School
Alteration
Results
$95,000 est. value
Fitchburg, MA 01420

Reported 02/19/2022 12:00 AM
Project Title

HVAC Chiller Elementary School

Physical Address View project details and contacts
City, State (County) Sutton, MA 01590   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The bidder shall furnish all labor, materials and tools required for the performance of this job with all costs included in their bid price. 2. Furnish and install one 230-ton Air Chiller, Trane Model RTAF 230, onto the existing pad. 3. The chiller must be in compliance with EPA regulations using R-134a refrigerant and capable of using R-513A as an alternate. 4. Demolition and removal of the existing chiller plant . 5. Perform the rigging, placement, and anchoring of the new chiller 6. Wire electrical connection to the existing chiller power connection and disconnect switch. 7. Reuse existing chilled water piping to and from the elementary school. Any exterior piping is required to be insulated with new insulation. 8. A new chilled water system strainer shall be installed. 9. Start-up with all required start-up fluids, and pressurized to the proper operating level. 10. If water is added to the new system, it needs to be a mixture of 35-40% glycol for winter protection 11. Connect to the current building control system and provide/install any associated equipment needed. 12. Perform piping system repairs, replacements, and modifications 13. Perform pumping system modifications, instrumentation, controls 14. Provide a minimum of one-hour equipment training. 15. Commissioning of the chiller and chiller control systems 16. All freight, transport, and receiving costs are to be covered in the bid price

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents