Similar Projects
North Waterfront Park Project
Post-Bid
Wilmington, NC

Neill's Creek Park Tennis Courts
Post-Bid
Angier, NC 27501

Design and Construction of a Ropes Course
Results
Statesville, NC 28677

Holly Street Park LWCF Renovations
Results
Less than $528,420 est. value
Rocky Mount, NC 27801

Hoke Loop Commons
New Construction - 88,610 SF
Construction
Fayetteville, NC

Zebulon Green
New Construction - 88,610 SF
Construction
Zebulon, NC

Beech Mountain Side Path Project
Post-Bid
Beech Mountain, NC

Westpointe Village Park Phase I
Results
Greenville, NC

Cambridge Park
New Construction
Construction
Mebane, NC

RLK Park Renovations and Ballfield Improvement
Post-Bid
Asheville, NC

Outdoor Track Resurfacing
Results
Durham, NC

Davie County Park
Construction
$3,987,000 est. value
Mocksville, NC

Vance Ballfield Renovations and Improvements
Post-Bid
Asheville, NC

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Kiwanis Family Park
Construction
Sanford, NC

Reported 04/24/2019 12:00 AM
Project Title

Fayetteville Street Elementary School Playground Equipment Replacement

Physical Address View project details and contacts
City, State (County) Durham, NC 27707   (Durham County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide all materials, equipment, and labor as necessary to install new playground equipment at Fayetteville Street Elementary. General Construction: 1. Provide project management for all aspects of project including site supervision, general coordination between any and all trades and safety management of all trades working on this project. 2. Apply and pay for all required permits from the appropriate agencies 3. Provide all labor, materials and equipment required to perform work. 4. Schedule and receive all necessary inspections for contracted. 5. Provide any dumpsters required for removal of debris from site. 6. Contractor is responsible for keeping the site clean and free of debris daily. Site should be left in the same or better condition than it was prior to commencement of this scope of work. Site definition includes the parking lot areas on site. 7. Contractor is responsible for location of all utilities required for the completion of the work, whether provided by ULOCO or private utility location contractor. 8. Contractor is responsible for containment of concrete, including all steps required to prevent concrete from traveling into utility tunnel. 9. Contractor is required to cover concrete with 6mil poly sheet and provide temporary fans for air movement during curing phase.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents