Similar Projects
Last Updated | 06/16/2021 09:39 AM |
Project Title | Replace HVAC Units Building 12007 |
Physical Address | View project details and contacts |
City, State (County) | Fort Hood, TX (Bell County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of this project is to upgrade the existing HVAC equipment at Building 12007 (Patriot Inn). The existing system consists of two air handlers (AHU-1 and 2), one make-up air unit (MAU-1), two condensing units (ACC-1 and 2), one boiler (B-1), and one hot-water storage tank. All equipment will be replaced in kind except for the boiler, which shall have increased capacity. Existing piping and ductwork shall be demolished and replaced as necessary to install new equipment. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |