Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

Fire Hydrants
Infrastructure
Post-Bid
Salem, OR

Silver Creek Raw Water Line Installation Project
Alteration
Results
$2,800,000 est. value
Silverton, OR 97381

Brass Corporation Bends
Term Contract
Results
Salem, OR

The Confederated Tribes of Siletz Indians Casino
New Construction, Infrastructure - 673,300 SF
Pending Verification
$280,000,000 CJ est. value
Salem, OR 97305

Del Taco / Salem
New Construction, Infrastructure - 2,400 SF
Pending Verification
$400,000 CJ est. value
Salem, OR 97305

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Hilfiker Lane SE at Commercial Street SE Intersection with Signal Upgrade - City of Salem
Infrastructure
Design
$4,448,690 CJ est. value
Salem, OR 97302

OR99E Salem Parkway (072) MP0 - MP5 Crack Sealing
Infrastructure
Post-Bid
Salem, OR 97317

Brass Meter Adapters
Term Contract
Results
Salem, OR

Four Corners Elementary School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Salem, OR 97317

Last Updated 07/25/2023 03:21 PM
Project Title

W. Hayes Street Improvements

Physical Address View project details and contacts
City, State (County) Woodburn, OR 97071   (Marion County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,108,244 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 6, 2022, project was awarded to Knife River Corporation, awarded amount is $3,108,244.60. The major items of work are estimated (approximate) quantities as follows: 1. Street reconstruction, 3,434 tons of asphaltic concrete, 4,455 cubic yards of aggregate base, 6,421 foot of concrete curb. 2. Sidewalk and driveway reconstruction, 36,833 square feet of concrete. 3. Traffic Signal with Intelligent Transportation System Technology 4. Rectangular Rapid Flashing Beacon 5. Street lighting 6. Storm drainage improvements, 2,442 LF of different pipe sizes and materials, 22 concrete inlets, six 48" concrete manholes, one bioretention pond. Bidders must be pre-qualified in accordance with the laws of the State of Oregon. Completed pre-qualification forms or proof of pre-qualification shall conform to the Special Provisions. Only bids from pre-qualified Bidders will be opened. No bid for a construction contract shall be received or considered unless the bidder is registered with the Construction Contractors Board. The Contractor and every Subcontractor must have a Public Works Bond filed with the CCB before starting work on the project. Bidders on this project need not be licensed for asbestos handling pursuant to ORS 468A.720. All proposals shall be accompanied by a Bid Bond, equal to ten percent (10%) of the total bid. Bid Bond shall be forfeited to the City if the Contractor fails to execute the contract within time allotted under the specifications. Pursuant to ORS 279C.370, bidders on public works projects with a contract value of $100,000 or more are required to disclose, 2-hours after bid opening, the bidders first-tier subcontractors. Although contract award is expected to be made by the City Council on Monday, May 9, 2022 The City of Woodburn reserves the right to reject any and all bids not in compliance with prescribed bidding procedures and requirements, and may reject for good cause any and all bids upon a finding of the Agency if it is in the public interest to do so. This project must be substantially completed not later than April 30, 2023. All project work shall be completed by June 30, 2023.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents