Similar Projects
Last Updated | 01/16/2020 07:47 AM |
Project Title | H--Fire Alarm, Fire Suppression, Inspection, Testing Maintenance and Repair Service |
Physical Address | View project details and contacts |
City, State (County) | Columbia, SC (Richland County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The WJB Dorn VA Medical Center is a 216-bed facility, encompassing acute medical, surgical, psychiatric, and long-term care. The hospital is in Columbia, South Carolina and provides primary, secondary, and some tertiary care. The Fire Alarm, Fire Suppression and Fire Damper inspection, testing, maintenance and repair services are mandated to be performed as required for the facility by The Joint Commission accreditation as well as all required regulations governed by the State and Federal government. The following is an APPROXIMATE listing of the number of devices in the hospital which shall require service. This listing is not claimed to be 100% accurate and is given only as an estimated to the bidder. Each bidder shall be responsible for scheduling a site visit to determine exact locations and quantities of the devices to be maintained. There are approximately 2642 Various Devices on the Medical Center Complex. There are approximately 6 Dry Pipe Fire Sprinkler Systems There are approximately 5280 Fire Sprinklers There are approximately 2 FM200 Clean Agent Fire Extinguishing Systems There are approximately 420 Fire Dampers There are approximately 6 Ansul Dry Chemical Extinguishing Systems There are approximately 1 Anti-Freeze Fire Sprinkler Systems There are approximately 20 Hydrants Located on the Medical Center Complex There are approximately 40 Backflow Prevention Devices on Water Lines There are approximately 3 Backflow Prevention Devices on City Lines |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |