Similar Projects
Blue Oval City Industrial Park
New Construction
Conception
$5,600,000,000 est. value
Stanton, TN 38069

Ariens Company New Manufacturing And Warehouse Facility
Renovation
Conception
$38,000,000 est. value
Fayetteville, TN

SweetWater Brewing
New Construction
Design
$200,000 est. value
Brentwood, TN 37027

Heraeus Precious Metals
New Construction, Addition, Demolition
Post-Bid
Wartburg, TN 37887

Portobello Tile
New Construction
Post-Bid
Baxter, TN

Woods Air Movement Headquarters
New Construction - 25,000 SF
Construction
Less than $3,600,000 est. value
Murfreesboro, TN

Advanex Americas Headquarters
New Construction - 40,450 SF
Construction
Less than $17,000,000 CJ est. value
White House, TN 37188

Microvast Battery Manufacturing Plant
Renovation - 600,000 SF
Pending Verification
Less than $220,000,000 est. value
Clarksville, TN 37040

Electric Car Factory
Renovation, Build-Out - 820,000 SF
Pending Verification
Less than $362,000,000 est. value
Memphis, TN 38125

Bush Brothers
Addition, Demolition - 11,500 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Dandridge, TN 37725

GM Electric Vehicle Battery Plant
New Construction - 2,800,000 SF
Pending Verification
Less than $2,200,000,000 est. value
Spring Hill, TN

Explosives Decomposition Chamber Facility
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value
Kingsport, TN 37660

Royal Canin Pet Food
Renovation, Addition - 108,000 SF
Pending Verification
Less than $200,000,000 est. value
Lebanon, TN 37090

Captive Aire Manufacturing Plant
New Construction - 250,000 SF
Post-Bid
$10,000,000 CJ est. value
Mohawk, TN

BRS Offroad Facility
New Construction
Pending Verification
Less than $1,700,000 est. value
Hohenwald, TN 38462

Reported 07/14/2022 08:10 AM
Project Title

VK Integrated Systems Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Clarksville, TN 37040   (Montgomery County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $840,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a manufacturing facility in Clarksville, Tennessee. Conceptual plans call for the construction of a manufacturing facility. Plans call for the construction of a new manufacturing facility. Further scope details have not been provided. As of July 13, 2022, this project is in the early planning stages. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents