Similar Projects
Ash Street Improvements
Results
Hudson, CO 80642

Parking Lot Maintenance 2020
Post-Bid
Less than $100,000 est. value
Greeley, CO 80639

Island Grove Poudre River Trailhead
Results
Greeley, CO

Construction Manager for Milliken Path Improvements
Results
Milliken, CO 80543

2020 Concrete Maintenance Services
Term Contract
Results
$150,000 to $200,000 est. value
Erie, CO 80516

Clerk and Recorder Building Site Work
Results
Greeley, CO 80631

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

Little Thompson River Trail Project
Post-Bid
Johnstown, CO 80534

Great Western Trail Improvements
Post-Bid
Windsor, CO 80550

Kahil Reconstruction Project
Post-Bid
Fort Lupton, CO 80621

65th Avenue Road Widening Project
Results
Greeley, CO 80631

2020 Bike Walk Maintenance Program
Results
Greeley, CO 80631

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

WCR23/Great Western Trail Pedestrian Connection - Design and Consultation Service
Post-Bid
Severance, CO

Centennial Trail Improvement
Post-Bid
Kersey, CO

Last Updated 10/01/2020 11:15 AM
Project Title

East Harmony Road and 1st Street Corridor Plans

Physical Address View project details and contacts
City, State (County) Severance, CO 80546   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Both East Harmony Road and 1st Street are designated as arterials in Severance: Hometown Vision Comprehensive Plan (2011). Each corridor contains physical characteristics that vary which will include the following: 1. Right-of-way widths 2. Traffic volumes 3. Vehicle Speed 4. Street improvements 5. Block and parcel sizes Both Corridors focus on vehicle travel without other consideration. Minimal landscaping along roadway edges paired with limited to no provisions for pedestrian or bicycle access dominate each corridor. As these each of these corridors serve as connections between neighboring communities as well as gateway/entryways to the Town of Severance, the Town looks to implement standards that will allow for an appealing aesthetic for residents, visitors, and merchants. In order to address the issues identified the Town of Severance is looking to develop a corridor plan with an emphasis on development and redevelopment. The Town is currently working on a new Comprehensive Plan, Land Use Code changes, as well as a Transportation Master Plan. This corridor plan will recommend standards and criteria by which development and redevelopment of existing properties can proceed and the community identity of the Town can be enhanced.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents