Similar Projects
Address Pavement Condition of I-69 Both Direction(S)
Infrastructure
Conception
$7,600,000 CJ est. value
Madisonville, KY 42431

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway
Infrastructure
Conception
$1,700,000 CJ est. value
Madisonville, KY 42431

Address Pavement Condition of I-69 Both Direction(S)
Infrastructure
Design
$8,750,000 CJ est. value
Madisonville, KY 42431

Southside Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$6,500,000 CJ est. value
Nortonville, KY 42442

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Electrical Rehabilitation
Infrastructure
Bidding
$240,000 CJ est. value
Madisonville, KY 42431

Construction of a 100 x 125 Hangar, Madisonville Municipal Airport
New Construction, Infrastructure - 12,500 SF
Post-Bid
Madisonville, KY 42431

Hopkins County Maintenance Garage - Construction
New Construction, Infrastructure - 21,000 SF
Post-Bid
$317,300 CJ est. value
Madisonville, KY 42431

Madisonville / Hopkins County Fiscal Court - Sportsplex BP1 - Rough Grading
Infrastructure
Results
Madisonville, KY

Bartlett Drive 10-Inch Water Line
Infrastructure
Results
$500,000 est. value
Madisonville, KY 42431

Construction of a Fire Training Center
New Construction, Infrastructure - 2,400 SF
Post-Bid
$1,000,000 CJ est. value
Madisonville, KY 42431

West Noel Avenue Sewer Interceptor Phase 1
Infrastructure
Results
$2,391,134 CJ est. value
Madisonville, KY 42431

S. Atkinson Water Main Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Earlington, KY 42410

Hopkins County Auxiliary Gymnasiums Additions
Addition, Demolition, Infrastructure
Post-Bid
$110,000 CJ est. value
Madisonville, KY 42431

Last Updated 03/14/2023 09:46 AM
Project Title

PHASE 2 West Noel Ave. Sewer Interceptor

Physical Address View project details and contacts
City, State (County) Madisonville, KY 42431   (Hopkins County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2,2022, this project has not yet been awarded. A timeline for award has not yet been established. The project consists of approximately 6,225 liner feet of 30 inch and 36 inch gravity sewer, jack & bore crossings, and associated structures. Due to the long delivery times, The City of Madisonville will be purchasing all sewer pipe and casing. Contractor will be responsible for purchase of all other required items. Delivery is projected at 3-5 months. A 5% bid bond is required with contractors bid. The award of this project will be to the lowest, responsive, responsible bidder. The Bidder awarded the contract shall complete this project within 180 calendar days, from delivery of pipe. Liquidated damages will be assessed at $500.00 per calendar day Every request for such interpretation should be in writing addressed to C. F. Williams, P.E. at Ronald Johnson & Associates, 24 W. Center St, Madisonville, Kentucky 42431. To be given consideration, questions must be received by 10 a.m. 7 calendar days before the bid opening date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents