Similar Projects
Coeur d'Alene Soccer Complex; Playground, Parking, RR / Shelter - City of Coeur d'Alene
Infrastructure
Conception
$330,000 CJ est. value
Coeur D Alene, ID 83815

Johnson Mill River Park Upgrades - City of Coeur d'Alene
Infrastructure
Conception
$1,200,000 CJ est. value
Coeur D Alene, ID 83814

Fourth Ave and Seltice Way Hotel
New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Post Falls, ID 83854

Mica Creek Bridge Repair
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Coeur D Alene, ID 83814

INT N Ramsey Rd
Infrastructure
Bidding
$5,000,000 CJ est. value
Rathdrum, ID 83858

MCOP Water Meter Purchase
Infrastructure
Post-Bid
Coeur d'Alene, ID

NIC: Resurfacing Parking Lots
Infrastructure
Post-Bid
$963,500 CJ est. value
Coeur D Alene, ID 83814

Post Falls Ponderosa Lift Station Replacement
Renovation, Infrastructure
Results
$2,814,154 CJ est. value
Post Falls, ID 83854

Post Falls Ponderosa Lift Station Replacement
Renovation, Infrastructure
Results
$2,814,154 CJ est. value
Post Falls, ID 83854

Avista Utilities Natural Gas Generation
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Rathdrum, ID 83858

Landing at Post Falls Mixed-Use
New Construction, Infrastructure - 46,000 SF
Pending Verification
$220,000,000 CJ est. value
Post Falls, ID 83854

Prairie Trail Extension - City of Coeur d'Alene
Infrastructure
Conception
$300,000 CJ est. value
Coeur D Alene, ID 83815

US-95, Spokane Rv Bridge Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Coeur D Alene, ID 83814

Water System Distribution System Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Rathdrum, ID 83858

Remington Transmission - Remington Recreational Water and Sewer
Infrastructure
Results
$61,521 CJ est. value
Athol, ID 83801

Last Updated 11/21/2022 05:02 PM
Project Title

TC Energy Gas Transmission Northwest Pipeline - ID

Physical Address View project details and contacts
City, State (County) Hayden, ID 83835   (Kootenai County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the modification of compressor stations along the Gas Transmission Northwest Pipeline in Oregon, Washington and Idaho. The project is pending approvals with the Federal Energy Regulatory Commission. There is some pushback from opponents of the expansion. Information regarding the architect and general contractor has not been determined. The owner is hoping that the FERC approves the project by February 2023. A firm timeline for construction has not been determined, construction is not expected to begin before summer 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents