Similar Projects
Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Thermo King
New Construction - 330,825 SF
Conception
Fort Pierce, FL 34945

Annex Industrial
New Construction - 171,602 SF
Design
$10,000,000 CJ est. value
Hialeah, FL 33018

Farmasi Distribution Center
New Construction - 71,690 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Doral, FL 33172

LCSO Evidence Storage Facility Warehouse Renovation
Renovation - 12,376 SF
Bidding
$500,000 CJ est. value
Tallahassee, FL 32303

Flooring Installation Services
Term Contract
Sub-Bidding
Fort Lauderdale, FL 33301

Harolena Persad Industrial
New Construction - 8,043 SF
Post-Bid
$400,000 est. value
Port Saint Lucie, FL 34952

Annual Contract - Flooring
Term Contract
Post-Bid
$100,000 to $2,000,000 est. value
West Palm Beach, FL 33411

Replace Carpet-VC De Soto NM
Results
Bradenton, FL

Raised Flooring System with Carpet
Results
Hurlburt Field, FL

Flexsol Packaging
Addition - 72,700 SF
Construction
$1,500,000 est. value
Pompano Beach, FL 33069

Jensen Beach Auto Vault
New Construction - 231,075 SF
Construction
$2,999,998 est. value
Jensen Beach, FL 34957

The Home Deport
New Construction - 640,000 SF
Pending Verification
$10,000,000 CJ est. value
Miami, FL

Jarmarc Industrial Park - Lot I
New Construction - 12,000 SF
Pending Verification
Bradenton, FL 34203

Industrial Workshop Building
New Construction - 64,000 SF
Conception
Tampa, FL 33616

Last Updated 07/22/2022 09:12 AM
Project Title

Remove Replace Flooring in Warehouse B1006 FANG Jacksonville, FL

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32218   (Duval County)
Category(s) Industrial/Manufacturing, Single Trades
Sub-Category(s) Flooring, Industrial Warehouse
Contracting Method Subcontractor Bidder To Subcontract, Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Sub-Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: Remove the existing paint and replace with an epoxy type commercial floor in Building 1006 warehouse.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents