Similar Projects
Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Crackfilling
Infrastructure
Post-Bid
De Pere, WI

Pond and Drainage System Construction
Infrastructure
Results
$264,024 CJ est. value
De Pere, WI 54115

Pond and Drainage System Construction
Infrastructure
Results
$264,024 CJ est. value
De Pere, WI 54115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Oak Park Drive Streambank Stabilization - ST26-01 - Village Of Bellevue
Infrastructure
Conception
$323,000 CJ est. value
Bellevue, WI 54311

Coachway Condominiums
New Construction, Infrastructure - 6,160 SF
Design
$30,000,000 CJ est. value
Ashwaubenon, WI 54304

2022 Crack Filling
Infrastructure
Post-Bid
Bellevue, WI

Last Updated 05/31/2023 10:49 AM
Project Title

Campus Sidewalk and Path Replacement

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54311   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $268,685 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. In general the work consists of: removing of existing asphaltic pavement and concrete pavement, saw cutting asphalt and concrete, shaping and compacting the base aggregate, placing concrete and hot mix asphaltic pavement. Additional work includes curb & gutter concrete sidewalk, erosion control, pavement marking, traffic control, drainage improvements, and site restoration. Estimate Construction Cost $234,000

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents