Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Venture Academy High School Improvements
Renovation
Conception
Minneapolis, MN 55414

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Tessman Ridge
New Construction, Infrastructure
Design
$20,400,000 CJ est. value
Brooklyn Park, MN 55445

Bassett Creek Park Off Leash Dog Area and Pedestrian Bridge Improvements
Infrastructure
Bidding
$2,079,215 CJ est. value
Crystal, MN 55422

Wading Pool Improvements at Jordan Park
Infrastructure
Bidding
$1,283,000 CJ est. value
Minneapolis, MN 55411

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 4,850 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

Paving Replacement and Site Improvements - Northport Elementary School
Infrastructure
Post-Bid
Brooklyn Center, MN 55429

Ice Rink and Arena Equipment with Related Supplies and Services
Results

Momentum Addition to Pagel Activity Center
Addition - 10,000 SF
Results
Minnetonka, MN 55345

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Baker OLC Shower/Infirmary Building
Construction
$900,000 to $950,000 est. value
Maple Plain, MN 55359

Huntington Bank Stadium Phase 1
Renovation - 20,000 SF
Pending Verification
Minneapolis, MN 55414

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

Last Updated 01/13/2023 03:34 PM
Project Title

Hopkins High School Stadium Synthetic Turf Improvements

Physical Address View project details and contacts
City, State (County) Hopkins, MN 55305   (Hennepin County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: remove the existing synthetic turf, E-layer and nailer board; install new synthetic turf with center logo, football, soccer, boys and girls lacrosse markings, install a new force reduction E-layer pad, touch up the existing fine aggregate drainage layer, install new nailer board; alternate bids to include: install a new bituminous pavement for the south D-zone; Install a new steel reinforced low water content concrete pavement with vapor barrier for the south D-zone; install a new 13mm Beynon BSS 1000 track surface for the south D-zone. Make bids on the bid form supplied in the Project Specifications. No oral, telegraphic or telephone bids or modifications will be considered. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. No Bid Bond is required. Bids may not be withdrawn within thirty (30) days after the scheduled time of the opening bids, without consent of the Owner. The Owner requires Start of Construction no earlier than June 12, 2023 and Substantial Completion of the project prior to August 11, 2023. In order to have proper cure time on the bituminous or concrete pavement alternates, the alternate, if selected, shall start no later than June 12, 2023 and must be complete by June 30, 2023. A pre-bid meeting will not be held. The Owner reserves the right to accept or reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents