Similar Projects
Replace Building 48 Roof System
Term Contract
Design
$500,000 to $1,000,000 est. value
Hines, IL 60141

Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Lyons Township High School - 2023 North Building Clay Tile Roof Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
La Grange, IL 60525

Murphy ES Roof Repairs
Renovation
Sub-Bidding
$300,000 CJ est. value
Chicago, IL 60618

Countywide Public Safety Roof Replacements at Department of Corrections - Phase III Multiple Buildings
Post-Bid
IL

2021 Roof Replacement at Community Center
Post-Bid
Streamwood, IL 60107

UIC Daley Library Roof Replacement
Renovation
Results
Chicago, IL 60607

Shingle and Fluid-Applied Roof Replacement
Results
Barrington Hills, IL

Heatherfield Roof Replacements
Renovation, Alteration
Design
Glenview, IL 60025

HVAC Upgrade and Roofing
Post-Bid
Hazel Crest, IL 60429

2021 Roof Replacement at Maine South HS
Renovation - 32,400 SF
Results
Park Ridge, IL 60068

FPDCC Busse Forest and Indian Boundary
Alteration
Post-Bid
IL

River Park Field House Roof & Masonry
Results
Chicago, IL 60625

Marquette Park - Fieldhouse & Landscape Buildings - Roof Replacements
Alteration
Post-Bid
Chicago, IL 60629

South Pumping Station Roof Replacement
Results
Oak Park, IL 60304

Last Updated 10/05/2022 02:23 PM
Project Title

2023 Admin, Rutledge Hall and Todd Hall Roofing

Physical Address View project details and contacts
City, State (County) Lincolnwood, IL 60712   (Cook County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $979,600 [brand] Estimate
Plans Available from Copy Center - 08/22/22
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to Board of Education, Lincolnwood School District 74, Lincolnwood, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. Each Bidder must satisfactorily complete the qualification process described in Section 004395-General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidders Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents