Similar Projects
Air Compressor for City of Taylor DPW
Term Contract
Sub-Bidding
Taylor, MI 48180

Scattered Site Homes, Asbestos Abatement Project
Term Contract, Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Highland Park, MI 48203

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Graffiti Removal Contract
Term Contract, Alteration
Post-Bid
MI

Gibson Elementary School Asbestos Abatement
Alteration
Results
Redford Township, MI 48239

Asbestos Abatement
Term Contract
Results
Detroit, MI

Demolition - 14108 Haggerty
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Van Buren Twp, MI 48111

Asbestos Survey
Term Contract
Post-Bid
Detroit, MI

Abatement Project - Spring and Summer 2022
Alteration
Results
Grosse Pointe, MI

Demolition 585 W Columbia
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Belleville, MI 48111

Lead Abatement / Minor Repair Services
Term Contract
Post-Bid
Detroit, MI 48226

Asbestos Abatement at Cambridge HS Prior to Renovations
Alteration
Results
Garden City, MI 48135

Gateway Theater Complex -Asbestos abatement at the Hilberry Theatre / Gretchen Valade Building
Alteration
Post-Bid
Detroit, MI

Asbestos Abatement At Edison, Hamilton & Schweitzer Elementary School
Alteration
Results
Westland, MI

Owen Intermediate School Asbestos Abatement
Alteration
Post-Bid
Belleville, MI 48111

Last Updated 12/05/2022 04:34 PM
Project Title

Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Dearborn Heights, MI 48125   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $47,150 [brand] Estimate
Plans Available from Civil Engineer - 09/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

** As of December 5, 2022, this project was awarded to Environmental Maintenance Engineers, Inc . However, Project has been canceled by the school district* Questions may be addressed to: Nova Environmental, Inc. Ann Arbor, Michigan 48105 Dearborn Heights School District #7 Mr. Jason Perkins, (313) 203-3231 Contractor shall construct one frill enclosure for the removal of the materials identified in the Scope-of Work. All walls shall be sealed with a minimum of two (2) layers of four (4) mil polyethylene. All remaining floors shall be sealed with a minimum of two (2) layers of six (6) mil polyethylene. All remaining ceilings shall be sealed in one layer of four (4) mil polyethylene. Full decontamination chambers shall be constructed and used for the duration of the project. Prior to any set up, the contractor shall construct wood frame and polyethylene barriers, where identified by Owner's Representative. Security of the building must be maintained at all times. It is the Contractor's responsibility to furnish and install security partitions immediately upon removal of any exterior building component. All temporary enclosures must be completed prior to leaving the site each day. Partitions shall be constructed to satisfaction of Owner and Owner's Consultant. All ceiling materials (including ceiling tile, glue pods, plaster board, plaster and support structures to deck) shall be removed and disposed of as ACM. Ceiling Removal Areas - The Contractor shall remove fluorescence light fixtures, properly box bulbs and drum ballasts and have the bulbs and ballasts recycled by approved facility. All light fixtures to be disposed of by Contractor. All remaining ceiling fixtures shall be decontaminated and placed in a designated location or disposed ofifequested by Owner

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents