Similar Projects
Ellsworth - Baldwin Construction / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Ellsworth, WI 54011

Ellsworth - Baldwin Construction / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Ellsworth, WI 54011

DeSanctis Park Villas
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
River Falls, WI 54022

DeSanctis Park Villas
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
River Falls, WI 54022

State Patrol Communication Tower Improvements - GPC
Infrastructure
Bidding
$2,080,000 CJ est. value
Bay City, WI 54723

2022 Road Pavement Maintenance Work
Infrastructure
Post-Bid
$200,000 est. value
River Falls, WI

East Hill Paving
Infrastructure
Post-Bid
$500,000 est. value
Plum City, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Cemetery Road, South Main Street to STH 65
Infrastructure
Results
$75,000 est. value
River Falls, WI 54022

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFQ Engineer - Elevator Modernization / University of Wisconsin, River Falls
Renovation
Pending Verification
$546,000 CJ est. value
River Falls, WI 54022

Radio Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
River Falls, WI 54022

Prescott - Ellsworth Constr / Culvert Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Ellsworth, WI 54011

Pierce County Campus - Parking Lot Sealcoating and Striping Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Ellsworth, WI 54011

Last Updated 05/12/2023 03:16 PM
Project Title

University of Wisconsin-River Falls Science & Technology Innovation Center

Physical Address View project details and contacts
City, State (County) River Falls, WI 54022   (Pierce County)
Category(s) Education, Green Building, Heavy and Highway
Sub-Category(s) College/University, LEED Certified, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $62,129,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 12, 2023, the project has been awarded. A timeline for construction has not been confirmed. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists of abatement and demolition of the existing Hagestad building, work at the existing chiller plant, a new 3-story Science and Technology Innovation Center and associated site work, housing teaching labs, research labs, offices, non-classroom learning spaces, and a University-Business Collaboration Center (UBC) of approximately 132,400 square feet (square footage includes a Mechanical Penthouse). Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. P.No- 3.20200068.00 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

3 Stories Above Grade, 132,400 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents