Similar Projects
The Parke at Houston Levee Mixed-Use Development
New Construction - 578,500 SF
Conception
Collierville, TN 38017

Village at Deer Run Phase 2
New Construction
Conception
Bartlett, TN 38134

Indian Lake Village Phase 3G
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Hendersonville, TN 37075

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Upper Chaney Woods Interceptor Sewer (Segments 4 and 3)
Infrastructure
Bidding
$3,000,000 CJ est. value
La Vergne, TN 37086

VTS Tullahoma Field Maintenance Shop General Purpose Bay
New Construction, Infrastructure
Bidding
$2,414,049 CJ est. value
Tullahoma, TN 37388

Hamblen County Schools 2021 Site Improvements at Two School Sites
Infrastructure
Post-Bid
Morristown, TN 37813

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Home Rehabilitation
Renovation
Results
Mount Carmel, TN

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Villages of Porter Farms Phase 21
New Construction - 40,000 SF
Construction
Collierville, TN 38017

East Main Townhomes
New Construction
Pending Verification
Chattanooga, TN

Autumnwood- Phase I
New Construction
Pending Verification
Dickson, TN 37055

Ridgeview Oaks
New Construction
Conception
$3,000,000 est. value
Columbia, TN 38401

Last Updated 09/09/2022 11:37 AM
Project Title

Charlotte Trace Subdivision

Physical Address View project details and contacts
City, State (County) Dickson, TN 37055   (Dickson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 9, 2022, this project is in the early planning stages. It will be reviewed by the Dickson Planning Commission on September 20, 2022 for preliminary plat approval. It received sketch plat approval in August 2022. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents