Similar Projects
2868 Rufina Street Mixed Use
New Construction - 126,382 SF
Conception
$10,000,000 CJ est. value
Santa Fe, NM 87507

Ruisodo Workforce Housing Development
New Construction
Conception
$980,000 est. value
Ruidoso, NM 88345

Orchard on the Alameda
New Construction - 22,100 SF
Design
Albuquerque, NM 87113

Westside Apartments Renovation
Renovation - 160,128 SF
Design
$1,000,000 est. value
Belen, NM 87002

Elevate on Third and Lomas
New Construction, Renovation - 185,346 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Albuquerque, NM 87102

Village at Las Soleras Apartments
New Construction, Infrastructure
Post-Bid
Santa Fe, NM 87505

Pinos Blancos Apartments
Renovation
Construction
Bloomfield, NM 87413

Acequia Lofts
New Construction - 738,000 SF
Construction
$10,000,000 CJ est. value
Santa Fe, NM 87507

Markana Uptown
New Construction - 589 SF
Pending Verification
Less than $500,000 CJ est. value
Albuquerque, NM 87110

Reserve by Markana in Northeast Heights
New Construction
Pending Verification
Santa Fe, NM

3600 And 3740 South Meadows
New Construction
Conception
Santa Fe, NM

Northstar Apartments
Renovation - 183,678 SF
Design
$1,700,000 est. value
Las Vegas, NM 87701

Belen Vista Apartments Rehab
Renovation - 56,603 SF
Post-Bid
Belen, NM 87002

Turquesa Apartments
New Construction - 250,616 SF
Construction
$10,000,000 CJ est. value
Santa Fe, NM 87507

San Isidro Plaza
New Construction, Renovation
Pending Verification
Santa Fe, NM 87507

Reported 06/30/2022 01:11 PM
Project Title

High Range 5 Residential Subdivision

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM 87144   (Sandoval County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $129,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on 70 acres between Excalibur Street NE and Guinevere Street NE. Scope details have not been released. As of June 29, 2022 the project is in planning stage and seeking preliminary plat approval from the City of Rio Rancho Planning and Zoning Board. A meeting was held June 14, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before year end 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, 2 Stories Above Grade, New Construction, 332 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents