Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

Madison Water Treatment Plant Upgrades
New Construction
Bidding
Madison, GA 30650

Hodgeville Booster Pump Station
New Construction
Bidding
GA

Towne Lake and Benton Lift Station Upgrade and Sewer Infrastructure
Post-Bid
Pooler, GA 31322

Snake Creek Water Treatment Plant Expansion
Addition
Post-Bid
Carrollton, GA 30112

Phase I Entrance Road
Results
Savannah, GA 31400

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

Rocky Creek Trunk Sewer Pumping Station
Construction
Augusta, GA 30900

2018 Camp Creek Water Reclamation Facility Improvements
Construction
College Park, GA

Loganville Water Transmission System Improvements
Bidding
Loganville, GA 30052

Lift Station No. 7 Improvements
Post-Bid
Less than $385,000 est. value
Thomasville, GA 31792

SEDA Manufacturing Center Master Lift Station and Force Main and Offsite Water Extension
Results
Less than $5,338,048 est. value
Savannah, GA

Pumpkinvine Creek WPCP 1.5MGD Expansion
Construction
Dallas, GA

Central Avenue Lift Station Rehabilitation Project
Renovation
Bidding
Savannah, GA 31406

Riverside Drive WTP FY2020 Basin Coatings Project
Post-Bid
Gainesville, GA 30501

Last Updated 08/03/2020 08:12 AM
Project Title

Northwest WRF Odor Control and Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of pumping and odor control improvements to the 12 million gallon per day (mgd) Northwest Cobb Water Reclamation Facility. The contract time for construction of the project is 365 calendar days (one year). The project consists of the following major items: 1. Replacement of two 400-hp influent pumps at the Proctor Creek Pump Station, with new check valves and isolation valves. 2. Upgrades and carbon media replacement to the Proctor Creek Pump Station odor control system. 3. Addition of an odor control misting system at the Proctor Creek Pump Station. 4. Construction of a treed berm at the plant Equalization Basins. 5. Addition of an odor control misting system at the Equalization Basins. 6. Replacement of the carbon adsorption odor control system and appurtenances at the Primary Clarifiers. 7. Replacement of odor control piping and appurtenances at the Sludge Storage Tanks. 8. Replacement of the chemical scrubber system with a carbon adsorption odor control system, dispersion fan, and appurtenances at the Sludge Storage Tanks. 9. Upgrades and carbon media replacement to the Dewatering odor control system, and a dispersion fan. 10. Addition of a hydrogen peroxide feed system at the digested sludge pump station. 11. Demolition and disposal of equipment and materials, as shown on the drawings. 12. Instrumentation and electrical system upgrades to accommodate the above improvements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Odor Control, Odor Treatment Equipment, Odor Dispersing and Masking/Counteracting Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents