Similar Projects
Roofing Repair and Maintenance
Post-Bid

Grandville Public Schools - West Elementary and Robotics Building Roof Improvements
Alteration
Post-Bid
Wyoming, MI 49418

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing and Skylight Replacement
Results
Grand Rapids, MI 49546

2022 KCTC/MAINT Roof Replacement
Alteration
Post-Bid
Grand Rapids, MI 49525

62A District Court Garage Roof Replacement
Results
Wyoming, MI 49509

GRPS Roof Placement Project
Alteration
Post-Bid
Grand Rapids, MI

Roof Replacement at Grand Rapids Police Department, Burton Fire Station and Franklin Fire Station
Results
Less than $653,294 est. value
Grand Rapids, MI

One Division - Roof Replacement
Alteration
Post-Bid
Grand Rapids, MI 49503

Roof Replacements - Parks
Results
Rockford, MI

Grandville Public Schools - East Elementary Roofing
Results
Grandville, MI 49418

Reroofing of the Outdoor Restroom Building
Results
Walker, MI 49534

2021 Kent ISD KTC Roof Replacement
Results
Grand Rapids, Kent City, MI 49525

High Tension Fabric Shelter - Used
Results
Kent City, MI

Clean Water Plant Main Building Roof Replacement
Alteration
Results
Wyoming, MI 49418

Reported 04/12/2022 12:00 AM
Project Title

Roofing

Physical Address View project details and contacts
City, State (County) Wyoming, MI   (Kent County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lee Middle/High (Sections 4, 5, and 18 Roof Survey) 1. Power vacuum and dispose of the ballast gravel from the roof. 2. Remove, properly dispose of existing EPDM membrane. 3. Mechanically attach on layer of 1.5" polyisocyanurate (ISO) insulation board with a 20# density. 4. Fully adhere a new 80-mil Thermoplastic roof system complete with flashings and accessories. 5. Tall wall details: A. Cut back EPDM and adhere the TPO wall flashing to the wall 12" up from roof deck. B. Seal the top of the TPO using extruded aluminum termination bar. Drape the EPDM over the termination bar. C. All large EPDM walls to be covered with metal siding by others. 6. Remove existing edge metal. Install new coping metal manufactured from 24-gauge steel. Color to be determined by owner's representative. 7. Furnish a manufacturer's 30-year warranty on all materials and workmanship.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents