Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Wood Utility Pole
Infrastructure
Bidding
Loveland, CO

District Generator Services
Term Contract, Alteration
Bidding
Fort Collins, CO

300 KVA Pad-Mounted Transformers
Post-Bid
Fort Collins, CO

Switchgear and Transformers for Foothills Campus
Post-Bid
Fort Collins, CO 80521

Foundry Car Chargers Installation
Results
Less than $45,000 est. value
Loveland, CO 80537

Annual Maintenance - Electrical Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Street and Traffic Stanby Generators
Post-Bid
Fort Collins, CO

Solar Photovoltaic Design and Installation
Results
Loveland, CO 80538

Backup Generator and Transfer Switch
Post-Bid
Fort Collins, CO

I-25 Electric Relocation Project - Boring Work
Results
Fort Collins, CO 80524

Fiberglass Streetlight Pole
Post-Bid
Fort Collins, CO

City of Fort Collins Transfort - Electric Bus Depot Chargers
Results
Fort Collins, CO

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$300,000 to $400,000 est. value
Estes Park, CO 80517

Low Voltage Cabling
Results
Loveland, CO

Reported 02/26/2022 12:00 AM
Project Title

Renewable Energy Supply Photovoltaic Solar Generation (PV Solar) and Battery Energy Storage Generation Systems

Physical Address View project details and contacts
City, State (County) Fort Collins, CO   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for 250 MW for photovoltaic solar generation and/or co-located battery energy storage generation system resources interconnected at the transmission or distribution system level Ideally, Platte River prefers utility scale project sizes in the 100 MW range and distribution projects up to 25 MW. Depending on Platte River`s progress toward its procurement target, Platte River may elect to procure a different amount than 250 MW.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents