Last Updated | 04/12/2023 02:03 AM |
Project Title | EH&S Chemical & Radiation Waste Accumulation Facility |
Physical Address | View project details and contacts |
City, State (County) | State College, PA 16801 (Centre County) |
Category(s) | Education, Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | College/University, Industrial Warehouse, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $10,407,000 [brand] Estimate |
Plans Available from | Architect - 02/13/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Bid Results Poole Anderson was not the low bidder on this project Construct a new Facility to house the University's Chemical and Radiation Waste Stream. Question Deadline 03/06/2023 The Bidder shall submit all questions, clarifications, bid document discrepancies or omissions via the eBuilder Q&A Board within the Bid Package All construction shown on the contract drawings and not expressly mentioned in the specifications and all work specified and not shown on the drawings, but obviously necessary to the proper execution of same, shall be performed by the Contractor, as it is not the intent to delineate or describe every detail and feature of work. No additions to the contract sum will be approved for any materials, equipment, and/or labor to perform work hereunder unless it can be clearly shown to be beyond the scope and intent of the drawings and specifications and absolutely essential to the proper prosecution of the work. C. Work under this contract consists of the complete construction work and includes, but is not necessarily limited to, the furnishing of all labor, superintendence, material, tools, and equipment necessary to complete all the work as shown on the contract drawings and as specified hereinafter. H-02 Work By Others A. Epoxy Floor System B. Lab Equipment & Casework C. Office & Locker Room Furniture D. Permanent Transformer Procurement and Installation. *Addendums 1, 2, 3, 4 & 5 have been released. *The Design Team and PSU have been made aware that the Clean Agent Fire Protection System as specified in the documents is not compatible with Oxidizers, Explosives, Organic Peroxides, and Pyrophoric chemicals. Contractors are to bid the project as currently design and specified. The Design Team and PSU will work with the awarded Contractor to create a Fire Protection System for these chemicals that meet code and safety requirements. |
||||||||||||||||||||||||||||||||||||||
Details | 9,400 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |