Similar Projects
Daytona Beach Courthouse Annex Ramp Renovation
Infrastructure
Bidding
$175,000 est. value
Daytona Beach, FL 32114

Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

As Needed New Sidewalk Installation and Repairs
Term Contract
Post-Bid
Deltona, FL

Fleming Avenue ADA Sidewalk
Results
Less than $70,500 est. value
De Land, FL 32720

Orange City Votran Parking Lot
Results
Less than $715,000 est. value
Orange City, FL 32763

Cherrywood Drive and Division Avenue Sidewalk Repair
Infrastructure
Post-Bid
Ormond Beach, FL 32174

Spring to Spring Trail, 3B, Rob Sullivan Park to Dirksen
Results
Less than $2,575,000 est. value
DeBary, FL 32713

Lime Tree Drive ADA Sidewalk Project
Results
Less than $155,000 est. value
Edgewater, FL 32132

Derbyshire Neighborhood Sidewalks Phase 1 - Third Street and Vine Street
Results
$589,000 to $763,000 est. value
Daytona Beach, FL 32100

Allen Green Center Parking Lot Sealcoating
Results
Port Orange, FL

Blue Spring State Park - ADA Boardwalk Replacement
Results
Less than $156,372 est. value
Orange City, FL 32763

Daytona Beach International Airport Parking Lot Improvements
Results
Less than $2,907,229 est. value
Daytona Beach, FL 32114

Jefferson Street Parking Lot
Results
New Smyrna Beach, FL 32168

Beresford Avenue Sidewalk
Results
Less than $520,000 est. value
FL

Florence Street On-Street Parking Improvements
Results
Less than $61,780 est. value
Ormond Beach, FL 32173

Last Updated 10/11/2021 11:42 AM
Project Title

Beville Road Multi Use Path - Lap

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32116   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Beville Road (SR 400) Multi-use path project is within the City of Daytona Beach in Volusia County. The limits of the project extend along the South side of Beville Road from Andros Isles Blvd to 150 feet West of Clyde Morris Blvd, connecting to the existing sidewalk. The total length of improvements is approximately 2.1 miles. The project scope includes construction of 8 to 12-foot-wide concrete path (4-inch thick) from Williamson Boulevard to 150 feet West of Clyde Morris Boulevard. Additional construction activities include gravity walls, pedestrian railing, splitter islands, tubular delineators, drainage modifications, signing and pavement marking. Additionally, mobilization, maintenance of traffic (MOT), erosion control, clearing and grubbing, removal of existing concrete, sodding, excavation, and embankment are also included as part of this project. Signal modification includes 4 new aluminum pedestrian signal poles and signals for Williamson Blvd and Pelican Bay Drive. Milling and resurfacing of some side-street turnouts is required to ensure ADA compliance.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents