Similar Projects
Lenox Dale Sewer and Water Main Replacement and Related Work
Bidding
Less than $1,100,000 est. value
Lenox, MA 01240

Andover Street (Rt.114) Water Main Replacement
Bidding
Less than $2,600,000 est. value
Danvers, MA 01923

Phase III Boston Post Road (Route 20) Water Main Improvements
Post-Bid
Less than $1,400,000 est. value
Wayland, MA 01778

Fire Hydrants
Term Contract
Post-Bid
Billerica, MA 01821

Z--CACO Chlorination Upgrades to Eight Public Water S
Results
$25,000 to $100,000 est. value
MA

Water Mains and Appurtenances - Cedar Street Area and Hanlon Road
Results
Less than $1,300,000 est. value
Holliston, MA 01746

Ductile Iron Pipe - Fiscal 2022
Bidding
Osterville, MA

Fire Hydrants
Post-Bid
Northampton, MA

Ductile Iron Pipe and Fittings
Results
Danvers, MA

Installation of Water Service Connections and General Water Installations/Maintenance - Fiscal 2022
Bidding
Osterville, MA

On-Call Emergency Repair Service for the Lowell Water Utility
Post-Bid
Less than $600,000 est. value
Lowell, MA

Gates Field Irrigation System Rehabilitation
Results
Less than $47,500 est. value
Danvers, MA

Berkshire Village Water Main Improvements
Bidding
$1,800,000 est. value
Lanesborough, MA

Purchase of Small Water Meters
Term Contract
Post-Bid
Springfield, MA 01101

Route 6 Watermain Crossing
Results
$135,000 to $200,000 est. value
Sandwich, MA

Last Updated 04/22/2021 12:29 PM
Project Title

Greenfield Road Water Main

Physical Address View project details and contacts
City, State (County) Deerfield, MA   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $940,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract includes, but is not limited to, the installation of approximately 3,200 linear feet of 8-inch HDPE water main. This work includes the installation of water main appurtenances, services, valves, hydrant assemblies, public and private property restoration, temporary water, installation of HDPE water main by directional drilling at stream/culvert crossings and Greenfield Rd. (Rtes. 5 & 10), disinfection and pressure testing. The time for full completion of this Contract is 150 calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents