Similar Projects
Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Single Span Bridge Replacement Including Removal
Renovation
Results
Canton, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes
Term Contract
Post-Bid
$250,000 CJ est. value
Springfield, IL 62703

Intersection Improvement with Flashing Lights and Lighting Upgrades in Fulton County
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Replace the Bridge Carrying Ch 2 Over Coal Creek, 4.25 Miles South of London Mills
New Construction, Infrastructure
Results
IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

D4 Fulton County Asphalt
Infrastructure
Results
IL

Deliver and Install Proposal of Road Repair
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewistown, IL 61542

RR-21-4821 Pavement Repairs
Infrastructure
Results

Culvert Extension
Infrastructure
Post-Bid
$500,000 CJ est. value
Canton, IL 61520

Red Ember Remedial Reclamation
Infrastructure
Results
$300,000 est. value
IL

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Fairview, IL 61432

Last Updated 12/19/2022 12:01 PM
Project Title

Replace the Bridge Carrying CH 2

Physical Address View project details and contacts
City, State (County) Cuba, IL 61427   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,199,397 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2022, the project has been awarded. A timeline for construction has not been confirmed. Replace the bridge carrying CH 2 over Otter Creek, 4 miles north of Astoria. Region 3 District 4 Federal Project # GWFM(991) County(s) Fulton Key Route(s) FAS 425 Marked Route(s) CH 2 Section(s) 20-00130-15-BR State Job #(s) C-94-125-20 PPS #(s) 4-10674-0000 Completion Date: October 06, 2023 Plus 25 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov This section consists of removal of the existing structure, construction of a two span steel plate girder bridge, and HMA surfaced approaches. The roadway will be closed to traffic during the construction of the project. A marked detour will be provided. Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 095 - Replace the Bridge Carrying CH 2 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents