Similar Projects
Construction of 10.656 Miles of Overlay
Infrastructure
Bidding
$250,000 est. value
Brandon, MS

Ultra -Thin Overlay
Infrastructure
Bidding
$2,000,000 est. value
Brandon, MS

Gulf Coast Regional Hopper Dredge Contract. Specification No. OM-21-300
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Gulfport, MS 39501

C900 Water Pipe FY 22 Commodity
Infrastructure
Post-Bid
Brandon, MS

Andrew Chapel Road Reconstruction
Results
$3,700,000 est. value
MS 22554

Northshore Landing Phase 6 Waterline
Results
Brandon, MS

Northshore Landing Phase 4 Waterline
Infrastructure
Post-Bid
Brandon, MS

Mill and Overlay Approximately 1 Mile on SR 18 from US 80 to the Terrapin Skin Creek Bridge
New Construction, Infrastructure
Results
MS

Highway 80 Eastgate and Highway 80 Municipal Drive Signal and Intersection Improvements
Alteration
Post-Bid
Brandon, MS 39042

2021 Roadway Sealing
Infrastructure
Results
Richland, MS

Annual Asphalt
Term Contract
Post-Bid
MS

Hot Mix Asphalt Overlay
Infrastructure
Results
$1,569,975 est. value
Pearl, MS

Asphalt Leveling and Patching
Term Contract
Post-Bid
MS

Mill and Overlay Approximately 10 Miles on SR 25 from SR 471 to SR 43 and Approximately 1 mile on Sandhill Road
Infrastructure
Results
MS

Road Repair
Alteration
Post-Bid
Jackson, Pearl, MS 39208

Last Updated 07/28/2022 11:36 PM
Project Title

Gunter Road Improvements Phase I

Physical Address View project details and contacts
City, State (County) Florence, MS 39073   (Rankin County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $3,002,838 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 24, 2022, project was awarded to Hemphill Construction Co. Inc., awarded amount is $3,002,837.84** Project will include asphalt removal, excess excavation, borrow excavation, asphalt paving, RCP drainage structures, traffic control, etc. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. to 5:00 p.m. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents