Similar Projects
Lower Allen Commons
New Construction
Design
Lower Allen, PA 17011

Blue Bell Mobile Home Park
New Construction
Design
Ephrata, PA 17522

Indiantown Gap National Cemetery | Phase 5 Development
New Construction, Renovation
Bidding
$20,000,000 to $50,000,000 est. value
Annville, PA 17003

AMR Forest City East
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Forest City, PA

Maia's Meadows - Infrastructure
New Construction
Post-Bid
Etters, PA 17319

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

New Borough Administration, Police and Community Center - All Site Work
New Construction
Results
Trainer, PA 19061

Nesquehoning Hose Company No. 1 Site Improvements
Results
Nesquehoning, PA 18240

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Fedex Crossdoc Facility - Phase 1
New Construction - 7,714 SF
Construction
$1,000,000 est. value
Pocono Summit, PA 18346

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

COG Demolition of 401 Bruce Street CD Project
Demolition, Infrastructure
Bidding
$50,000 est. value
McKees Rocks, PA 15136

Penn State Mont Alto Campus Arboretum Garden - Phase 1
Post-Bid
$103,000 to $150,000 est. value
Mont Alto, PA 17237

Design Activities Are Limited To: Concrete Curb Ramps
Results
$5,000,000 to $7,499,999 est. value
PA

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Last Updated 05/23/2022 10:57 PM
Project Title

Fire Substation - Final Site Work

Physical Address View project details and contacts
City, State (County) Eighty Four, PA 15330   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the Contractor furnishing all labor and materials required for completing all final site work at a partially constructed site, including, but not limited to pouring a concrete dumpster pad and installing concrete bollards with plastic sleeves; relocating and installing parking lot/street signage; installation of wheel stops for parking spaces; removing sediment from the storm sewer; installing storm sewer pipe and a catch basin; conversion of ponds into rain gardens; as well as landscaping; site grading; traffic control; site preparation; and site restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents