Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

South Railroad Avenue Bridge
Infrastructure
Bidding
$6,000,000 CJ est. value
Bay Saint Louis, MS 39520

Pearl River Community College Aviation Aerospace Workforce Academy
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Kiln, MS 39556

Diamondhead Road Maintenance and Improvements - Phase 1
Infrastructure
Post-Bid
$800,000 CJ est. value
Diamondhead, MS 39525

Bayou La Croix Boat Launch
Infrastructure
Results
$809,000 est. value
Bay Saint Louis, MS

Hurricane Zeta Washington Street Pier Repairs
Infrastructure
Results
Bay Saint Louis, MS 39520

Murphy Oil #6892/7823 / Waveland
New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Waveland, MS 39520

5-Bay Hangar
New Construction, Infrastructure - 18,660 SF
Post-Bid
$300,000 CJ est. value
Kiln, MS 39556

Hurricane Zeta Clermont Harbor Pier Repairs
Infrastructure
Results
MS

Construction of a Pole Barn
New Construction, Infrastructure
Post-Bid
$450,000 CJ est. value
Kiln, MS 39556

Veterans Memorial Repairs (Rebid)
Renovation, Infrastructure
Results
$101,620 CJ est. value
Waveland, MS 39576

Stennis International Airport - North Apron Expansion Phase 2
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Kiln, MS 39556

Bayou Drive Kayak Launch Repair
Infrastructure
Results
$76,100 CJ est. value
Diamondhead, MS 39525

Hancock County Utility Authority Repair And Replacement Unit Price Project - 2022
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Waveland, MS 39576

Rock and Timber Replacement Project
Infrastructure
Results
$238,960 CJ est. value
Bay Saint Louis, MS 39520

Last Updated 12/20/2022 10:31 AM
Project Title

Bay St. Louis Municipal Harbor Fuel Dock and Improvements

Physical Address View project details and contacts
City, State (County) Bay Saint Louis, MS 39520   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 20, project was awarded to Gill’s Crane & Dozer, but awarded amount is not available. The work included in the Contract shall consist primarily of Construction of the following items: Installation of concrete pilings, timber decking, accessible floating dock and fuel dock pier coverings Bids must be submitted upon the standard forms contained within the contract documents furnished by Engineer, noted in the Information for Bidders. Each bid shall be accompanied by a Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Mississippi, in the amount of five percent (5%) of the total bid price, payable to the owner as bid security. Bidders shall also submit a current financial statement, if requested by the Owner. The successful bidder will be required to furnish a Performance Bond and a Payment Bond each in the amount of one hundred percent (100%) of the contract amount. The required documents shall be submitted in a sealed envelope and the outside of the envelope shall be marked plainly as: Bay St. Louis Municipal Harbor Fuel Dock and Improvements and the Certificate of Responsibility Number. Bids shall be deposited with the City of Bay St. Louis, Bay St. Louis City Hall, 688 Highway 90, Bay St. Louis, MS 39520 or for those interested, bids can be submitted at electronically. under the project page, prior to the hour and date designated above. No oral, telegraphic, telephonic, or e-mail proposals shall be considered. All interpretations of drawings and specifications shall be directed to Jason Chiniche at Chiniche Engineering and Surveying by email. An acknowledged received copy of all Addenda issued by the Engineer via Plan House must be included with the bid proposal. No bidder may withdraw his bid within sixty (60) days after the date of actual bid opening without Owner's consent. The Owner reserves the right to reject any or all bids and to waive any or all informalities.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents