Similar Projects
Dell Children's North Hospital
New Construction - 186,885 SF
Conception
Austin, TX 78717

Dell Children's North Hospital
New Construction - 186,885 SF
Conception
Austin, TX 78717

Medical City Healthcare Patient Tower
New Construction - 300,000 SF
Design
$10,000,000 CJ est. value
Frisco, TX 75034

Pastoral Care Suite
Renovation - 2,000 SF
Design
$250,000 est. value
Dallas, TX 75235

El Paso VA New Health Care Center
New Construction - 500,000 SF
Bidding
$500,000,000 est. value
El Paso, TX 79920

Renovations of the Bentaub Hospital Tower Level 2 Storage Rooms
Renovation
Bidding
Less than $250,000 est. value
Houston, TX

Renovate Alkek Hospital, Main Building, Floor 12
Renovation
Sub-Bidding
Less than $7,100,000 est. value
Houston, TX

South Campus Vivarium
Post-Bid
Dallas, TX 75235

Women & Children's Bed Tower and Associated Projects - Package 12
New Construction - 570,000 SF
Post-Bid
$10,000,000 CJ est. value
San Antonio, TX 78229

Y--Reconfigure 2J Basement Floor for IT & Administration Space (VA-19-00046746)
Renovation
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Anti-Ligature Renovations at Terrell State Hospital
Renovation
Results
$4,617,341 est. value
Terrell, TX 75160

Surgery Center of North Texas
New Construction - 23,000 SF
Construction
$7,500,000 est. value
Anna, TX 75409

Texas Health Harris Methodist Hospital Alliance
Addition - 65,000 SF
Construction
Fort Worth, TX 76244

Covenant Children's Hospital
Renovation
Pending Verification
$5,900,000 est. value
Lubbock, TX 79410

Medical City Dallas Emergency Department
Renovation - 8,000 SF
Pending Verification
$5,400,000 est. value
Dallas, TX 75243

Last Updated 07/09/2021 08:02 AM
Project Title

CMR for Building 602 Renovations and Roof Replacement/Campus Generator Replacement, Kerrville State Hospital

Physical Address View project details and contacts
City, State (County) Kerrville, TX 78028   (Kerr County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs), All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $3,113,834
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 21.1% Provide pre-construction and construction services for the following general scope of work regardless of the Project is to be completed as a single package or in multiple combination packages. Construction-Manager-at Risk (CMR) shall perform and coordinate all pre-construction and construction services for the following project as a single package or in multiple combination packages. Provide complete interior demolition and building construction for Building 602 including drywall/finishes, HVAC, electrical, plumbing and fire alarm system, security, building communications and lighting systems. Roof replacement is also included. Provide early release package for Buildings 630, 578 and 502A - Emergency generators and associated ATS, wiring and equipment. In lieu of a personal site visit because of Covid-19 issues, Respondent must carefully review Exhibit I, Project Site Conditions Photobook consisting of a PowerPoint of the site conditions as visual aids to assist in determining the costs for the Project. PART ONE: Collaborate with HHSC and its architects and engineers (A/E), RBDR, PLLC, during the drafting and completion of the Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule, and ultimately determine the Guaranteed Maximum Price. The services include, but are not limited to, attendance at meetings, and consultation regarding plan reviews, constructability reviews, and cost estimating. PART TWO: In accordance with the approved schedule and GMP, Contractor shall facilitate bidding and selection of subcontractors in compliance with HUB requirements, and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E and HHSC.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Packaged Generator Assemblies, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents