Last Updated | 08/31/2022 06:32 AM |
Project Title | Building E Utility Plant Renovations and Improvements |
Physical Address | View project details and contacts |
City, State (County) | Pomona, NY 10970 (Rockland County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Medical Office/Outpatient, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes a Project Labor Agreement. All work shall be included under one contract, General Contracting. The scope of the work includes but is not limited to: Removal of the existing original out of service single low-pressure boiler, air separator, the existing original out of service single chiller and all associated piping, pumps, and related electrical services. Remove existing three (3) low pressure boilers and replace with sufficient service. Remove existing (2) high pressure boilers. Remove and replace boiler water treatment system. Remove and replace all associated boiler feed water systems. Remove and replace all site distribution pump packages, valves and controls. Remove and replace cooling towers, condenser water treatment system, and condenser water pump packages. Remove and replace 2 steam absorption chillers with electric centrifugal chillers. Remove and replace chilled water treatment system. Remove and replace domestic hot water heater. Remove and replace all steam to hot water heat exchangers. Remove and replace selected piping as required. Perform repairs to chimney and breeching. Install new chimney liners. Remove and replace emergency generator to support entire Utility Plant operation (heating & cooling) during a power outage. Remove and upgrade with new fuel oil pump packages. Provide new lighting for Utility Plant. Upgrade all electrical control panels. Remove and replace all expansion tanks. Provide new DDC control system for all equipment in the Utility Plant. Abate all asbestos containing materials from the Utility Plant. Trenching and underground utility piping and conduit. Removing of existing concrete equipment pads, slotting of floor, patching, and prepping floor. Forming and pouring of new equipment pads. (See Project Plans and Specifications for complete scope of work) General Requirements - Certification/Training - Certified Payroll - Contractors License Required - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Job Location Building E 50 Sanatorium Rd, Pomona NY 10970 Question Acceptance Deadline 09/15/2022 04:00 PM EDT Questions are submitted online No |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |